Storie di successo
ZIN, Brussels (Belgium)
A model of circularity
ZIN is the redevelopment project of the site where the WTC 1 and 2 buildings once stood, near Brussels-North station. This highly innovative, multifunctional project has an above-ground surface area of approximately 110,000 m², including 75,000 m² of office space, 14,000 m² of residential space, 240 hotel rooms, and areas for sports, leisure, hospitality, and retail.
With its design based on circularity, the environmental impact is minimized, and the building is nearly energy neutral.
By preserving large portions of the existing building, 16,000m³ of concrete was saved, along with another 50,000m³ for the existing basement. Additionally, a total of 30,000 tons of concrete was dismantled and reused. This is truly a Cradle-to-Cradle certified project.
Approximately 70,000 m² of office space is leased by the Flemish government, while the remaining 5,000 m² is available for rent, with a separate entrance and private terraces.
Thanks to the long-standing collaboration with Belimo, VMA was able to rely on our expertise, both in design, execution, and aftercare.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici, Edificio residenziale, Ristorante, Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Valvole a farfalla, Sensori, Sensori da canale (aria)
- Prodotti:
- Electronic pressure-independent 2-way control valves (EPIV)
- Prodotti:
- Air damper actuators
- Prodotti:
- Temperature and pressure sensors
- Prodotti:
- Butterfly valves
- Messa in servizio:
- April, 2024
Zero Failures
Belimo Helps Trane Technologies Streamline Sensor Installation and Commissioning
Built in 1999 and located in Madison, Alabama, Heritage Elementary School serves grades K-5 and enrolls more than 800 students. In 2021, Trane Technologies’ Huntsville, Alabama branch was contracted to overhaul the school’s existing building automation systems (BAS) as part of an overall HVAC system renovation and upgrade. The scope of work included replacing 73 water source heat pumps, adding an additional hot water boiler, hot water circulating pump, and upgrading the existing control system. As part of the project, Trane also needed to install 79 new temperature and humidity sensors – one for each heat pump and six additional sensors for make-up air units. Due to time constraints and the need to minimize potential rework caused by sensor failures, they turned to Belimo.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Sensori
- Messa in servizio:
- August, 2022
- Success Story - Heritage Elementary (pdf - 2,26 MB)
Wood Hub, Auderghem (Belgio)
Il Wood Hub è uno degli edifici più ambiziosi del Benelux in termini di prestazioni energetiche e impronta di carbonio.
Il gruppo industriale multidisciplinare CFE, BPI Real Estate, BPC Group e Wood Shapers ha unito le proprie competenze per costruire la sua nuova sede ad Auderghem. Wood Hub, un edificio per uffici altamente sostenibile, innovativo e accogliente di circa 7300 m², costruito da e per i loro dipendenti.
VMA, anch'essa parte di CFE, ha fornito le speciali tecnologie.
Grazie a una combinazione intelligente di legno sostenibile e struttura in calcestruzzo, l'edificio ha un'impronta di carbonio molto bassa e vanta anche le certificazioni BREEAM Outstanding e WELL Platinum. Con quasi 300 pannelli solari fotovoltaici e l'energia geotermica, l'ufficio è praticamente autosufficiente in termini di energia.
Oltre agli uffici, al piano terra si trova un atrio con spazi di co-working e aree benessere.
La terrazza verde sul tetto è inoltre un luogo ideale per promuovere le sinergie e le interazioni umane.
VMA si è occupata dell'intera installazione tecnica e del software Smart Building (VMANAGER) utilizzando una vasta gamma di valvole motorizzate 2-vie, 3-vie e 6-vie indipendenti dalla pressione di Belimo.
Gli attuatori per serrande tagliafuoco Belimo contribuiscono ad aumentare la sicurezza, mentre i sensori Belimo raccolgono tutti i dati necessari per consentire al trattamento dell'aria di creare un clima interno perfetto.
L'implementazione di un progetto di tale portata spesso non va del tutto secondo i piani e in genere richiede continue regolazioni. A questo proposito, VMA può contare sulla flessibilità e sul supporto di Belimo.
VMA ha scelto Belimo per la sua comprovata qualità, il servizio e la consulenza tecnica.
I tecnici conoscono inoltre il semplice processo di assemblaggio e commissioning dei prodotti Belimo, garantendo un'installazione senza problemi.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Valvole di regolazione a sfera (CCV), Valvole a farfalla, Sensori, Sensori da canale (aria), Sensori da tubazione (acqua), Attuatori, Attuatori per serrande antincendio
- Prodotti:
- Valvola di regolazione indipendente dalla pressione (PIQCV)
- Prodotti:
- Valvola di regolazione a sfera (CCV)
- Prodotti:
- Valvola di regolazione elettronica a 6 vie indipendente dalla pressione (EPIV)
- Prodotti:
- Sensori di temperatura e di pressione
- Prodotti:
- Valvola di regolazione elettronica con misurazione dell'energia (Energy Valve)
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Valvole a farfalla
- Messa in servizio:
- December, 2023
Wild & Küpfer AG, Schmerikon (Svizzera)
20% di risparmio energetico nella generazione di riscaldamento e raffreddamento e condizionamento dell'aria.
La crescita superiore alla media del settore MedTech ha reso necessaria la costruzione di un annesso per camere bianche, assemblaggio, logistica e capacità di immagazzinamento. Il nuovo edificio a tre piani è stato messo in servizio nell'autunno 2019 dopo un periodo di costruzione di due anni. La capacità della camera bianca è stata triplicata al piano terra per un totale di 1800 metri quadrati. Il piano seminterrato viene utilizzato per nuove aree di immagazzinamento e il secondo piano per la produzione e l'assemblaggio. Un ristorante interno per il personale, progettato per servire circa 200 dipendenti, è stato poi aperto all'ultimo piano nel 2020.
- Località:
- Svizzera
- Tipologia di edificio:
- Impianto di produzione, Ristorante
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Attuatori per serrande (senza funz. sicurezza), Attuatori per serrande (con funz. sicurezza), Portata dell'aria variabile (VAV), Valvole, Valvole di zona, Valvole a farfalla, Valvole a globo, Sensori
- Prodotti:
- Attuatori rotativi
- Prodotti:
- Regolatori VAV
- Prodotti:
- Valvole di zona
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Attuatori per valvole a globo e valvole
- Prodotti:
- Vari sensori
- Referenze – Wild & Küpfer AG Schmerikon, Svizzera (pdf - 1,95 MB)
Western Wyoming Community College
Belimo CCVs, Sensors, VAVs Help College Achieve Efficiency Goals
Western Wyoming Community College is a public community college located in Rock Springs, Wyoming that was established in the fall of 1959. Western offers a range of educational programs, including certificates, associate degrees, and a bachelor’s degree. In the early 2000s, Western upgraded their pneumatically controlled air handlers to direct digital control (DDC). However, the pneumatic control valves and actuators for the hot and chilled water coils, as well as the single and dual-duct VAVs, were left untouched. Belimo’s RetroFIT+ program, which offers a complete approach to upgrading HVAC systems in existing buildings, was instrumental in helping Western become more energy efficient. In total, Belimo was able to deliver over 300 CCV ball valves, 260 spring return actuators, 230 airflow measurement & control actuators (VAV Compact), and 570 temperature sensors for the retrofit.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Portata dell'aria variabile (VAV), Valvole di regolazione a sfera (CCV), Sensori da canale (aria)
- Prodotti:
- CCVs, Sensors, Airflow Measurement & Control
- Messa in servizio:
- May, 2024
- Success Story – Western Wyoming College, USA (pdf - 1,89 MB)
Western University
Belimo Energy Valve with Delta T Manager Improves Cooling Efficiency and Occupant Comfort
Founded in 1878, Western University in London, Ontario, is widely regarded as one of Canada’s premier collegiate institutions with an on-campus population to approximately 40,000 students, faculty, and staff. With overall utility costs that average over CAD 20 million, Western’s facilities team devotes considerable time and resources to improve energy efficiency and sustainability. By replacing their network of air handling unit (AHU) control valves with 223 Belimo Energy Valves, Western was able to optimize Delta T, advance overall system performance, and increase occupant comfort. Overall, the project lowered chilled water consumption by 32% year over year while significantly reducing utility peak demand charges by CAD 2.1 million in the first year, CAD 2 million in the second year, and CAD 2.5 million in the third year.
- Località:
- Canada
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Prodotti:
- Belimo Energy Valves
- Success Story - Western University, Ontario (pdf - 852 KB)
Wenzhou Oujiangkou Hospital Project
Build trust with customers with the high quality products
Wenzhou Oujiang Kou Hospital is located in Longwan district Wenzhou, Zheng Jiang Province. It is a grade A tertiary large-scale general hospital with 1,200 regular hospital beds. The total construction area of the hospital is 158,350 square meters. It will be the largest hospital in Wenzhou Area, providing excellent and convenient medical service for 0.8 million people in the Oujiangkou area.
The project utilises a ground-source heat pump combined with an ice storage air-conditioning system, which requires high stability and reliability of the butterfly valve and actuator. Belimo won the full trust of the customer with high quality products and customised after-sales services.
- Località:
- Cina
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole a farfalla
- Prodotti:
- Fan coil valve: 2500 sets
- Prodotti:
- Butterfly valve: 83 sets
Viessmann Vitoair FS 300E, Allendorf (Germania)
Soluzioni compatte per il massimo vantaggio del cliente.
Viessmann è un'azienda a conduzione familiare con sede ad Allendorf (Eder) in Germania che sviluppa sistemi energetici intelligenti e sostenibili e soluzioni HVAC per edifici residenziali, industriali e commerciali. Fondata nel 1917, l'azienda impiega più di 14.500 persone in 74 Paesi. Di questi, 9.000 dipendenti lavorano per la divisione Climate Solutions.
Come Belimo, Viessmann è sinonimo di soluzioni sostenibili ed efficienti dal punto di vista energetico con i più alti standard di qualità. In qualità di OEM (Original Equipment Manufacturer), l'obiettivo dell'azienda è quello di ottimizzare il comfort interno degli edifici attraverso prodotti intelligenti e fonti energetiche a risparmio di risorse. Utilizzando gli attuatori per serrande della serie UM di Belimo, Viessmann ha sviluppato il sistema di ventilazione domestica Vitoair FS 300E, che è uno dei più piatti del suo genere e offre quindi opzioni di installazione uniche.
- Località:
- Germania
- Tipologia di edificio:
- Edificio residenziale
- Tipo di progetto:
- Nuovo edificio, Ristrutturazione
- Gamma prodotti:
- Attuatori, Attuatori per serrande (senza funz. sicurezza)
- Prodotti:
- Attuatore per serranda UM230Y-F-L
- Messa in servizio:
- January, 2022
- Referenze – Viessmann Vitoair FS 300E, Germania (pdf - 2,03 MB)
VIB BIO-Incubator nv, Ghent (Belgium)
The Flanders Institute for Biotechnology (VIB) in Flanders, Belgium, promotes research in the life sciences. VIB’s mission includes conducting groundbreaking biomolecular research for scientific and societal enrichment.
To meet the rapidly growing demand for infrastructure for start-ups in the biotech sector, VIB built the brand-new Bio-incubator in Ghent.
With eight floors and over 6,000 net m² of state-of-the-art laboratory infrastructure and office space, the building will accommodate 10 to 15 biotech start-ups from both domestic and international markets.
To provide all these spaces with a healthy indoor climate in a CO2-neutral manner, Equans pulled out all the stops. Since Equans, through various subsidiaries, has all the necessary techniques in-house, it succeeded in obtaining the BREEAM sustainability certification "Excellent" for this building.
Belimo also contributed with pressure-independent 6-way valves (EPIV) to supply all climate ceilings with the correct flow rate for both cooling and heating. As a result, each 6-way valve ensures the highest possible comfort with the lowest possible energy consumption.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici, Fabbrica di ricerca
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Electronic pressure-independent 6-way zone valves EPIV
- Messa in servizio:
- August, 2024
Van Laere, Zwijndrecht (Belgio)
L'impresa edile fiamminga Van Laere sta definendo nuovi standard in termini di innovazione e sostenibilità
Vera e propria azienda originale fiamminga, Van Laere è un'impresa edile, leader a Kruibeke da oltre 85 anni. Dal maggio 2023, tuttavia, ha sostituito i suoi edifici vecchi di 70 anni con una sede nuova di zecca un po' più distante, a Zwijndrecht.
Con una superficie di approssimativamente 2600 m², l'edificio offre spazio per 85 postazioni di lavoro. Con la sua miriade di texture di legno, è un tipico esempio di edifici per uffici sostenibili del futuro.
Grazie alla combinazione di un design intelligente, di scelte responsabili dei materiali e di impianti HVAC ottimizzati con un software intelligente, le emissioni di CO2 sono state ridotte a 1/10 rispetto a quelle di un edificio per uffici convenzionale.
Cegelec ha lavorato con le valvole a 6-vie indipendenti dalla pressione di Belimo per fornire i soffitti del condizionamento dell'aria.
Inoltre, tutte le portate energetiche sono state mappate in modo trasparente grazie alle Energy Valve Belimo. Per la protezione antincendio, l'edificio è dotato di serrande tagliafuoco Belimo.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Attuatori, Attuatori per serrande antincendio
- Prodotti:
- Valvola di regolazione elettronica a 6 vie indipendente dalla pressione (EPIV)
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Valvola di regolazione elettronica con misurazione dell'energia (Belimo Energy Valve™)
- Messa in servizio:
- May, 2023
UTEK (Italia)
Come il pressostato differenziale ottimizza le unità di trattamento aria e le rende più sicure.
All'inizio del 2017, Belimo ha introdotto una nuova gamma di sensori per condotti per applicazioni di ventilazione e sensori per tubazioni per applicazioni idroniche. La nuova gamma prodotti è stata presentata all'OEM UTEK. Il pressostato differenziale 01APS ha catturato il loro interesse. UTEK sviluppa e produce unità di trattamento aria e recupero calore per applicazioni residenziali e industriali e utilizza già diversi attuatori per serrande Belimo.
- Località:
- Italia
- Tipologia di edificio:
- Edificio residenziale, Impianto di produzione
- Tipo di progetto:
- Nuovo edificio, Ristrutturazione
- Gamma prodotti:
- Sensori, Sensori da canale (aria)
- Prodotti:
- Sensore di pressione differenziale 01APS
- Referenze – UTEK, Italia (pdf - 1,74 MB)
US Census Bureau
Pressure-Independent Valves Make Cost-Effective Alternative to Reverse Return System for US Census Bureau
It was right there in black and white. Paraphrased, the guideline stated that pump and piping systems shall be arranged in a reverse return configuration. The standard is part of the GSA’s (US General Service Administration) design guide, known as the PBS-P100, and serves as the guideline for all US governmental buildings. However, to all rules, there are at least one or two exceptions. Such was the case with the new US Census Bureau headquarters located in Suitland, Maryland. The 8-storey, 1.5 million sq ft facility, scheduled to be completed in October 2006, simply was not a good candidate for the use of reverse return for all systems.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio governativo
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valve
- Reference - US Census Bureau, USA (pdf - 190 KB)
University of Sonoma State
Precision Control Plays Important Role in Sonoma State University Renovation
Sonoma State University had high aspirations for converting the original Ruben Salazar library into a multi-use facility and was willing to go the distance to achieve their goal without a large increase in campus demand for peak power. Be assured, a project like this demands much careful consideration, from selection of the 106-kW solar photovoltaic system to the valves and actuators that control water flow and damper operation in over 100 zones.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Characterised Control Valve
- Reference - Sonoma State University, USA (pdf - 1,47 MB)
University of Oregon
University of Oregon’s Football Complex Runs at Maximum Efficiency
Built in 2013, the University of Oregon’s (U of O) Hatfield-Dowlin Complex in Eugene is one of the most advanced sports facilities in the world. The six-storey, $63 million building, donated by Nike founder (and Oregon alumnus) Phil Knight and his wife penny, features 142,000 square feet of meeting space, locker rooms, offices, lounges, and auditoriums, along with a cafeteria and state-of-the-art football fitness centre. Since the complex was commissioned, facilities personnel at U of O have been focused on continuously enhancing efficiency and improving occupant comfort by leveraging the latest and greatest building technologies. The most recent example of this occurred in the winter of 2017 with the installation of six Belimo PR Series butterfly valve actuators.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole a farfalla
- Prodotti:
- Advanced Butterfly Valve Actuators
- Case Study University of Oregon (pdf - 256 KB)
University of North Florida
Control Strategy has University of North Florida Seeing ORANGE
The University of North Florida (UNF) chilled water plant gives new meaning to the term “Florida orange”. At first glance it looks as though the chilled and condenser water piping were laden with large, orange-coloured tropical fruit. But the assortment of brightly coloured Belimo control valves is in place throughout the plant (and campus) to save the university energy and labour. It is part of a carefully orchestrated control strategy, developed and implemented by the Campus, the engineering community, and Facility Automation Solutions in Jacksonville, Florida that gives plant personnel computerised remote control over chilled water and cooling tower operation.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valve
- Reference - University of North Florida, USA (pdf - 162 KB)
University of New Brunswick, Canada
University of New Brunswick, Canada Efficiency that fits to a T
Low Delta T occurs when the supply and return chilled water temperature across an HVAC system is less than the chiller’s design calls for. This was evident on two separate structures at the University of New Brunswick in Fredericton, Canada, where Belimo Energy Valve™ helped achieve real-world savings through optimisation of chiller operations.
- Località:
- Canada
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valves
- Reference - University of New Brunswick, USA (pdf - 266 KB)
University of Miami
University of Miami The Belimo Energy Valve™ Cures Medical University's Low-Delta-T
The University of Miami medical campus saves thousands of dollars and increased plant capacity with the Belimo Energy Valve retrofit.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valves
- Reference - University of Miami, USA (pdf - 341 KB)
Università di Hamm-Lippstadt, Hamm (Germania)
900 attuatori per serrande tagliafuoco integrati nel progetto di ventilazione tramite Modbus
Dopo quasi quattro anni di costruzione, nel 2014 sono stati inaugurati i nuovi edifici del campus di Hamm e Lippstadt (Germania). L'università è dedicata alle cosiddette materie "MINT" (matematica, informatica, scienze naturali e tecnologia) e offre spazio nei suoi laboratori all'avanguardia, nelle aule didattiche e nelle aule per seminari a 4000 studenti e 120 cattedre per la ricerca e l'insegnamento. Il campus di Hamm ha nel frattempo ricevuto lo "Ionic Award" per il design. Il contributo all'ingegnoso concetto di ventilazione e protezione antincendio è stato fornito da Belimo sotto forma di unità di comunicazione e di alimentazione BKN230-24-MOD.
- Località:
- Germania
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Attuatori per serrande antincendio
- Prodotti:
- 900 unità comunicazione e di alimentazione elettrica BKN230-24-MOD
- Messa in servizio:
- June, 2014
- Referenze – University of Hamm-Lippstadt, Germania (pdf - 1,22 MB)
Università di Scienze Applicate di Zurigo (Svizzera)
Regolazione efficiente delle zone per un comfort ottimale.
Garantire un clima interno ottimale è essenziale per la concentrazione e il rendimento di studenti e insegnanti della FFHS. A tal fine, nel nuovo edificio sono stati installati moderni sistemi di riscaldamento e raffreddamento dotati di componenti Belimo. Altri prodotti Belimo sono stati utilizzati nella protezione antincendio dell'edificio. I sistemi sono stati progettati da Jakob Forrer AG e installati da Hälg AG.
- Località:
- Svizzera
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di zona, Valvole di regolazione a sfera (CCV), Valvole di regolazione indipendenti dalla pressione, Attuatori, Attuatori per serrande antincendio, Portata dell'aria variabile (VAV)
- Prodotti:
- Valvole di regolazione a sfera a 6-vie
- Prodotti:
- Valvole di regolazione a sfera a 6-vie indipendenti dalla pressione
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Regolatori di portata
- Messa in servizio:
- March, 2021
- Referenze – University of Applied Sciences Zurich, Svizzera (pdf - 2,37 MB)
Ospedale universitario, Zurigo (Svizzera)
Comfort ambiente facilmente regolabile nelle stanze dei pazienti grazie ai prodotti Belimo.
Il peso del trattamento di malattie e infortuni gravi non grava solo sul personale ospedaliero e sulle infrastrutture. Sono soprattutto i pazienti a dover affrontare degenze prolungate e trattamenti impegnativi.
L'Ospedale universitario di Zurigo (USZ) è sempre stato tra i migliori nel trattamento delle ustioni e ha riconfermato il proprio primato con l'apertura del nuovo edificio «SUED2». Tra le altre cose, in questo edificio si trova la clinica specializzata per il trattamento dei pazienti con ustioni che, grazie all'utilizzo dei prodotti Belimo, offre ai pazienti il massimo comfort e rende le lunghe degenze più gradevoli. L'edificio è stato progettato e realizzato dalla Direzione immobili dell'USZ in collaborazione con la Direzione dei lavori di costruzione del Cantone di Zurigo. L'installazione HVAC è stata pianificata da Hochstrasser Glaus & Partner Consulting AG, l'integrazione di sistemi da Burkhalter Technics AG.
- Località:
- Svizzera
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Valvole, Sensori, Sistemi, Valvole di zona, Valvole a globo, Valvole a farfalla, Integrazione bus
- Prodotti:
- Valvole di zona 6-vie
- Prodotti:
- Valvole a globo
- Prodotti:
- Attuatori rotativi
- Prodotti:
- Attuatori per serrande
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Gateway Modbus
- Prodotti:
- Vari sensori
- Messa in servizio:
- October, 2019
- Referenze – University Hospital Zurich, Svizzera (pdf - 1,96 MB)
Twin²Sim Università di Scienze Applicate, Salisburgo (Austria)
Il futuro della tecnologia dell'edificio è basato sui dati.
L'Università di Scienze Applicate di Salisburgo (FH) è stata fondata nel 1995 e offre una varietà di programmi di laurea triennale e magistrale per più di 3.000 studenti all'anno. Nel 2021, l'Università di Scienze Applicate di Salisburgo ha implementato il progetto di ricerca Twin²Sim presso il campus di Kuchl. Twin²Sim rappresenta il più grande investimento di ricerca effettuato dall'Università di Scienze Applicate di Salisburgo dalla sua fondazione. Composto da un banco di prova, diverse sale di prova e un laboratorio multifunzione, Twin²Sim offre ai ricercatori nel campo della tecnologia edilizia e dell'edificio opportunità di ricerca e di pratica uniche.
In Twin²Sim sono installate varie unità Belimo, tra cui valvole di regolazione a sfera indipendenti dalla pressione (PIQCV), valvole di regolazione 6-vie indipendenti dalla pressione (EPIV) e sensori di portata. Questa installazione viene utilizzata per effettuare ricerche sui sistemi di riscaldamento e raffreddamento in diverse condizioni e con l'utilizzo di diverse facciate. TB D+H ha realizzato la pianificazione HVAC per questo progetto, mentre la pianificazione MCR è stata responsabilità di TB Novias, e R+S Systems GmbH ha supervisionato l'integrazione di sistemi.
- Località:
- Austria
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Sensori, Sensori da tubazione (acqua)
- Prodotti:
- Valvole di regolazione a sfera indipendenti dalla pressione (PIQCV) con attuatore BACnet
- Prodotti:
- Valvole di regolazione elettroniche indipendenti dalla pressione 6-vie (EPIV)
- Prodotti:
- Sensori di portata
- Prodotti:
- Energy Valve Belimo
- Messa in servizio:
- January, 2023
- Referenze – Twin²Sim University of Salzburg, Austria (pdf - 1,82 MB)
Centro di formazione ROVC, Ede (Paesi Bassi)
Apprendimento interattivo con tecnologia HVAC all'avanguardia.
ROVC è il leader di mercato olandese per la formazione di esperti tecnici dell'industria e del settore marittimo. Oltre 15.000 professionisti vengono formati ogni anno a Rotterdam, Helmond ed Ede. Il centro di formazione di Ede è stato costruito nel 2021 ed è dotato di tecnologie all'avanguardia nei settori dell'energia, della gestione dell'edificio e del condizionamento dell'aria. Si estende su 7.100 m², di cui 3.000 m² sono utilizzati solo per la formazione pratica. Nel nuovo edificio si trovano anche 18 aule, una mensa e diversi uffici. Qui vengono offerte opportunità formative uniche, soprattutto per quel che riguarda la formazione nel settore HVAC: per esempio, l'edificio dispone di sette diversi sistemi di condizionamento dell'aria moderni, tra cui un sistema CHP (Combined Heat and Power), una pompa di calore aria-acqua e un sistema VRF (Variable Refrigerant Flow). Questi offrono ai tirocinanti l'opportunità di vedere, toccare con mano e sperimentare la tecnologia HVAC più all'avanguardia. In qualità di partner di ROVC, Belimo ha fornito un totale di 679 dispositivi di campo e supporta il centro di formazione nella preparazione ottimale degli specialisti di domani a pianificare e implementare soluzioni HVAC efficienti.
- Località:
- Olanda
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Valvole, Belimo Energy Valve™, Sensori
- Prodotti:
- Vari attuatori
- Prodotti:
- Varie valvole
- Prodotti:
- Belimo Energy Valve™
- Prodotti:
- Vari sensori
- Messa in servizio:
- January, 2021
- Referenze – Training Centre ROVC, Paesi Bassi (pdf - 2,26 MB)
Torre Eqho, Parigi (Francia)
Modernizzazione e ristrutturazione di soffitti riscaldanti/raffreddanti con valvole Belimo a 6 vie
La torre Eqho, situata nel quartiere La Défense di Parigi, è stata oggetto di un'importante ristrutturazione nel corso di diversi anni. Originariamente chiamata "Descartes Tower", è un grattacielo per uffici alto 130 metri (40 piani) inaugurato nel 1988. L'obiettivo di questa ristrutturazione era quello di modernizzare tutte le installazioni tecniche per il condizionamento dell'aria e gli impianti elettrici. Un'area di 27,000 m² è stata dotata di soffitti combinati per il riscaldamento e il raffreddamento. La torre Eqho dispone ora di 80,000 m² di uffici e offre posti di lavoro a circa 5,300 persone.
- Località:
- Francia
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di zona
- Prodotti:
- 6000 valvole 6-vie
- Messa in servizio:
- January, 2013
- Referenze – Tour Eqho, Francia (pdf - 2,17 MB)
Torre Origami
Energy Valves Solve Low Delta T Syndrome Torre Origami, a 360 foot tall [110 meters], 23-story office building, is occupied with up to 2000 people a day. Torre Origami’s primary variable flow chilled water plant includes three 330 ton chillers with a design flow of 1693 GPM. Before the Energy Valve installation, at peak load, two or three chillers ran to deliver the required flow to the buildings he power consumption of the three chillers in operation at the same time was correspondingly massive However, despite the tremendous energy usage, the cooling capacity in the office was anything but stable. To solve this problem, Grupo Cinsa turned to Belimo and retrofitted 24 AHU cooling coils that serve each floor of the building with Belimo Energy Valves.
- Località:
- Messico
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™, Attuatori, Valvole a farfalla
- Prodotti:
- Belimo Sensors: Belimo Energy Valves, damper actuators,
butterfly valves
- Success Story - Torre Origami, Mexico (pdf - 1,57 MB)
- belimo_torre-origami_success-story_fr-ca.pdf (pdf - 1,58 MB)
- belimo_torre-origami_success-story_pt-br.pdf (pdf - 1,58 MB)
- belimo_torre-origami_success-story_es-mx.pdf (pdf - 1,57 MB)
Tirol Kliniken GmbH, Natters (Austria)
Efficienza energetica negli ospedali.
Il monitoraggio mirato dei dati energetici mostra dove e in quale quantità l'energia viene consumata.
Tirol Kliniken GmbH è la più grande e versatile azienda sanitaria dell'Austria occidentale. La società gestisce sette sedi con più di settanta edifici di varie età e con diverse strutture tecniche. L'azienda partner di Klimabündnis Österreich è determinata a contribuire al raggiungimento degli obiettivi internazionali in materia di clima nel miglior modo possibile, garantendo così la qualità della vita delle generazioni presenti e future.
- Località:
- Austria
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™
- Prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- July, 2017
- Referenze – Tirol Kliniken GmbH Natters, Austria (pdf - 2,13 MB)
The Tian'an Sunshine Plaza (1,000 Trees)
Pressure-independent control at the core of the 1,000 Trees development in Shanghai
The Tian'an Sunshine Plaza (1,000 Trees) project is breaking ground near Shanghai’s vibrant city center, showcasing a building complex that blends cutting-edge technology with sustainable design. The goal for the 1,000 Trees project was to create a building that would relate to the surrounding park and the arts district, and its name stems from the 1,000 trees planted in the 400 terraces throughout. This multipurpose development aims to create a green, environmentally friendly urban area combining boutique shopping, catering, leisure, tourism and entertainment.
- Località:
- Cina
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole a farfalla, Valvole di regolazione indipendenti dalla pressione, Valvole a globo, Valvole di regolazione a sfera (CCV)
- Reference - 1,000 trees (pdf - 825 KB)
The Phoenix Companies, Inc.
Phoenix Reduces Chilled Water Expenses with Pressure-Independent Technology
Hartford, Connecticut’s most iconic building also may be one of its most difficult to heat and cool. The corporate headquarters of The Phoenix Companies, Inc. at One American Row in downtown Hartford is a true architectural landmark. The 13-storey building, designed by famed twentieth-century architect Max Abramovitz and completed in 1963, is the first New England office building to be both LEED certified and on the National Register of Historic Places. However, the building’s ship-like profile and glass curtain walls cause tremendous solar gain, creating ongoing heating and cooling challenges for Phoenix.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Electronic Pressure-Independent Valve
- Reference - The Phoenix Companies, USA (pdf - 178 KB)
Tennessee State Office Building
Citizens Plaza stands in the heart of Downtown Nashville. The Class A, 275,000 square feet, 15-storey office building was constructed in 1984 and houses multiple Tennessee governmental agencies. During a typical workday, it has anywhere from 800 to 1,200 occupants. "At Citizens Plaza, we were experiencing high utility thermal inefficiency charges from Metro Nashville District Energy System due to low Delta T and over pumping”, said Chad Lovell, Operations and Safety Specialist at JLL. After all 15 Belimo Energy Valves became operational in Citizens Plaza, the average flow through the building during full occupancy reduced by over 200 GPM [12.6 l/s] versus the previous year when the original globe valves were still in place. As a result of the retrofit project, Belimo Energy Valves was able to reduce chilled water pumping by 49%, which equated to about $23,000 in annual savings.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valve
- Success Story - Tennessee State Building, USA (pdf - 1,91 MB)
Taiwan Semiconductor Manufacturing Company Limited (TSMC) - Nanjing Plant
The world's largest integrated circuit manufacturer (TSMC) chooses Belimo
Taiwan Semiconductor Manufacturing Company Limited, known as TSMC, is the world's largest integrated circuit manufacturer and the largest listed company in Taiwan. TSMC's annual total capacity reaches 4.3 million pieces of wafer. Belimo characterised control valves, damper actuators and fire and smoke damper actuators have been selected by TSMC (Nanjing) Co., Ltd. as the only qualified products.
The integrated circuits production process has restricted requirements on temperature, humidity and cleanliness of the plant. Therefore, precise control and execution of the HVAC system is very important. The reliability of Belimo fire and smoke damper actuators and the precision of characterised control valves have received high recognition from TSMC.
- Località:
- Cina
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Valvole, Valvole di regolazione a sfera (CCV)
- Prodotti:
- Damper actuator: 216 sets
- Prodotti:
- Characterised control valves: 199 set
SwissCo Services AG, Sisseln (Svizzera)
Nuovo chiller con attuatore PR comunicativo - Affidabilità, sicurezza ed efficienza energetica ottenute con Belimo
Un circuito di raffreddamento affidabile è particolarmente importante per l'azienda farmaceutica SwissCo Services AG di Sisseln (CH). La temperatura e soprattutto l'umidità negli impianti di produzione sono determinanti per la produzione dei prodotti effervescenti e delle pastiglie dell'azienda. Oltre a un funzionamento affidabile e al mantenimento costante dei livelli di temperatura e umidità, l'obiettivo della ristrutturazione dell'impianto di raffreddamento era quello di ottimizzare il consumo energetico.
- Località:
- Svizzera
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole a farfalla
- Prodotti:
- 2 combinazioni di attuatore per valvole a farfalla con BACnet MS/TP
- Report – SwissCo Services AG, Switzerland (pdf - 1,56 MB)
- Report – SwissCo Infographic (pdf - 311 KB)
Stadler Rail, St. Margrethen (Svizzera)
Riscaldamento e raffreddamento economici per il miglior comfort ambiente possibile.
Dopo più di 20 anni passati ad Altenrhein, nel 2020 Stadler si è trasferita in una nuova fabbrica per treni a due piani e a più unità a St. Margrethen. Su una superficie di circa 35,000 metri quadri, quasi 850 dipendenti sviluppano, producono e assemblano treni, tram, materiale rotabile e carrozze passeggeri per il mercato svizzero e internazionale. In ulteriori 5,000 metri quadri di uffici, circa 500 dipendenti svolgono un lavoro di sviluppo e supportano Stadler nell'ambito dei progetti e delle approvazioni.
- Località:
- Svizzera
- Tipologia di edificio:
- Impianto di produzione, Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Valvole di zona, Sensori
- Prodotti:
- Valvole di regolazione elettroniche indipendenti dalla pressione EPIV
- Prodotti:
- Valvole di zona 6-vie
- Prodotti:
- Attuatori per serranda
- Prodotti:
- Vari sensori
- Messa in servizio:
- January, 2020
- Referenze – Stadler Rail St. Margrethen, Svizzera (pdf - 2,33 MB)
Sports Entertainment Complex
Belimo Energy Valve Proves Air Coils are Batting a Thousand
According to this sports entertainment complex, its 18-building main campus is the company’s “mother ship”, employing close to 4,000 people. It is the job of these employees to keep this 24/7 sports channel running. The buildings on campus are also an important factor. They need the most efficient and reliable mechanical systems in order for the show to go on. That is why Belimo chose this facility to install its Energy Valves.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- 4 Energy Valves
- Reference - Sports Entertainment Complex, USA (pdf - 441 KB)
Piscina sportiva e per famiglie DonauSplash, Tulln (Austria)
Misurazione, controllo, bilanciamento e isolamento con una sola unità di valvole
La piscina coperta DonauSplash di Tulln, costruita originariamente nel 1974, ha riaperto dopo quasi un anno e mezzo di lavori di ristrutturazione generale nell'ottobre 2014. L'intera tecnologia dell'edificio è stata aggiornata nell'ambito della ristrutturazione generale e della conversione da gas naturale a teleriscaldamento a biomassa. L'obiettivo dei consulenti di progettazione della tecnologia dell'edificio era l'utilizzo efficiente dell'energia; del resto, la potenza calorifica è di circa 500 kW. Ogni ora vengono trasferiti circa 30 m³ di acqua per controllare la temperatura delle singole zone di balneazione. La valvola elettronica indipendente dalla pressione (EPIV) di Belimo ha una chiusura a tenuta per evitare perdite di energia nei circuiti dell'acqua e aumenta l'efficienza durante la progettazione, la realizzazione e il funzionamento.
- Località:
- Austria
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- 16 valvole di regolazione elettroniche indipendenti dalla pressione (EPIV)
- Referenze – Sport & family swimming pool "DonauSplash", Austria (pdf - 1,53 MB)
sitem-insel, Berna (Svizzera)
L'affidabile tecnologia del sensore garantisce il funzionamento ottimale del sistema.
L'Istituto per la medicina traslazionale e imprenditoriale (sitem-insel) è stato inaugurato ad agosto 2019 come parte dell'Ospedale universitario di Berna (Inselspital), dopo un periodo di costruzione durato quasi due anni e mezzo. Il centro rafforzerà ulteriormente il ruolo di Berna come uno dei leader del settore medico di interesse internazionale. L'obiettivo principale del centro di ricerca e innovazione è il trasferimento delle scoperte scientifiche derivanti dalla ricerca di base e dallo sviluppo industriale nelle applicazioni cliniche.
- Località:
- Svizzera
- Tipologia di edificio:
- Ospedale, Fabbrica di ricerca
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Attuatori, Sensori, Valvole a farfalla, Valvole a globo, Sensori da canale (aria)
- Prodotti:
- Valvole a globo
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Attuatori a globo e rotativi
- Prodotti:
- Sensori di temperatura da condotto e a immersione
- Prodotti:
- Sensori di pressione e di pressione differenziale
- Messa in servizio:
- August, 2019
- Referenze – sitem-insel Bern, Svizzera (pdf - 1,63 MB)
Centro commerciale Alte Druckerei, Winterthur (Svizzera)
Soluzioni intelligenti a costo ottimizzato aumentano il comfort e la sicurezza nell'edificio.
Ziegler Druck- e Verlags-AG era un fornitore di servizi mediatici e una casa editrice svizzera fondata nel 1836 con sede a Winterthur. La casa editrice comprendeva i giornali "Der Landbote" e il "Winterthurer Stadtanzeiger". In seguito all'acquisizione da parte del gruppo mediatico di Zurigo Tamedia, la tipografia Ziegler ha cessato l'attività alla fine del 2015.
- Località:
- Svizzera
- Tipologia di edificio:
- Centro commerciale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Attuatori per serrande (senza funz. sicurezza), Valvole, Valvole a farfalla, Valvole a globo, Valvole di regolazione indipendenti dalla pressione, Attuatori per serrande antincendio, Sistemi, Integrazione bus
- Prodotti:
- Valvole di regolazione a sfera elettroniche indipendenti dalla pressione EPIV
- Prodotti:
- Valvole a globo e attuatori per valvole a globo
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Attuatori rotativi
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Integrazione MP-Bus
- Messa in servizio:
- October, 2019
- Referenze – Shopping Centre Alte Druckerei Winterthur, Svizzera (pdf - 1,89 MB)
Shell Point
Belimo Pressure-Independent Technology Provides an Efficient, Long-Term Solution for Growing Retirement Community
Shell Point Retirement Community in Fort Myers, FL, is an extraordinary property. With over 400 acres and nearly 2000 residents, it is Florida’s largest life care retirement community, combining all the services of a comprehensive staged elder care facility and the amenities of an all-inclusive resort. Also extraordinary is the fact that this sprawling property, which includes a 75-acre island and a wide assortment of medical, recreational, and living facilities, is served almost entirely by one central energy plant. The efficient and seamless delivery of heating and cooling to the outlying buildings is, in no small part, thanks to the nearly 1500 Belimo Pressure-Independent Control Valves (PICCV).
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio per anziani
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valves
- Reference - Shell Point, USA (pdf - 137 KB)
Shanghai Hongqiao SunnyWorld Centre
Health, a sense of well-being, and productivity are dependent upon room climate
The building complex is located near the fourth largest Chinese airport and not far from the National Exhibition Center. Over 70,000 square meters of commercial floor space surrounded by international hotels, a highly efficient, flexible office and a residential building has been constructed. The ground floor of which is characterised by vibrant stores, restaurants and plenty of space for public use. A generously appointed, park-like green space in the center of the complex is an attractive spot for residents and passersby to while away their time.
- Località:
- Cina
- Tipologia di edificio:
- Hotel
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Pressure independent zone valves: 2300 sets
- Shanghai Hongqiao SunnyWorld Centre (pdf - 1,21 MB)
Scott Sports HQ, Givisiez (Svizzera)
Oltre 800 componenti Belimo sono stati installati nel nuovo e premiato edificio di Scott Sports.
Nella primavera del 2019, il produttore svizzero di articoli sportivi Scott Sports si è trasferito in un nuovo edificio per uffici nella sua sede centrale di Givisiez. L'imponente e prestigioso edificio offre oltre 26,000 metri quadrati di spazio a 600 dipendenti. Il fulcro è un atrio inondato di luce con doghe di legno verticali. Un altro elemento che attira l'attenzione sono le vele di protezione solare in filigrana in alluminio anodizzato sulla facciata. Lo studio di architettura Itten+Brechbühl ha ricevuto nel 2017 il premio d'oro dello Swiss Arc Award per il processo Open BIM.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Valvole, Valvole a farfalla, Valvole di zona, Valvole a globo, Sensori
- Prodotti:
- Attuatori per serrande
- Prodotti:
- Valvole di zona indipendenti dalla pressione
- Prodotti:
- Valvole di zona 6-vie EPIV
- Prodotti:
- Valvole a globo
- Prodotti:
- Valvole a farfalla on/off
- Prodotti:
- Sensori
- Messa in servizio:
- January, 2019
- Referenze – Scott Sports Givisiez, Svizzera (pdf - 2,21 MB)
Ristorante di montagna Scharmoin, Lenzerheide (Svizzera)
Quando si sa dove scorre l'energia, si sa come controllarla
Funzionamento e alimentazione di calore ottimizzati dal punto di vista energetico grazie alla Belimo Energy Valve™.
L'altitudine del ristorante di montagna Scharmoin nella regione sciistica di Arosa Lenzerheide (Svizzera) è di 1,900 metri. I tempi per il completamento del progetto di costruzione sono stati di soli otto mesi. Indipendentemente dalle condizioni climatiche, l'apertura è stata fissata per l'inizio della stagione sciistica 2013/14. L'edificio del ristorante di montagna ospita non solo l'intera fornitura di energia termica per il ristorante, ma anche per l'edificio adiacente che ospita la funivia. Per garantire un funzionamento ottimizzato dal punto di vista energetico e quindi sostenibile, i gestori di Lenzerheide Bergbahnen AG hanno deciso di integrare la tecnologia dell'edificio nel loro sistema di gestione. Con la Belimo Energy Valve™ questo è stato possibile senza problemi.
- Località:
- Svizzera
- Tipologia di edificio:
- Ristorante
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Sistemi, Belimo Energy Valve™
- Prodotti:
- 2 Belimo Energy Valve™
- Prodotti:
- 2 valvole a globo (3-vie)
- Prodotti:
- 3 valvole di regolazione (3-vie)
- Referenze – Scharmoin mountain restaurant, Svizzera (pdf - 1,97 MB)
Red Wing School District & the Goodhue County Education District
Belimo Energy Valve with Cloud Connectivity Helps Red Wing School District Stay on the Cutting-Edge of Energy Efficiency
Located in Goodhue County, Minnesota, on the western bank of the Mississippi River, the Red Wing Public School District is a model of energy efficiency in the educational sector. Over the last two decades, Red Wing has made a substantial commitment to environmental stewardship and sustainability – leveraging the latest and greatest building technologies to reduce energy consumption and enhance the learning environment for its 2,700+ students. With a total of 109 Energy Valves installed across the district, Belimo has played an essential role in helping Red Wing achieve its sustainability goals. The Energy Valves help facility personnel optimise Delta T and HVAC system water usage, and with cloud connectivity, the district can capitalise on the many benefits afforded by the Internet of Things (IoT).
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valve
- Success Story - Red Wing School, USA (pdf - 1,26 MB)
Ransom Everglades School experiences significant energy and monetary savings
Energy Valve Helps Maximise Performance of New Chiller Plant
Ransom Everglades is a premier independent school for grades 6 - 12 located on two campuses in Coconut Grove in the south of Florida. The institution combines rigorous college preparation with a long tradition of experiential learning and a commitment to educated graduates to leave the world better than they found it. As part of the mission, Ransom Everglades has made a concerted effort to promote environmental sustainability by continually seeking out opportunities for energy conservation measures across its facilities. Over the years, the school has worked closely with its controls contractor, Smart Building Solutions (SBS), to update aging systems and deploy cutting-edge solutions to improve energy efficiency. One technology that played a critical role in its most recent capital project was the Belimo Energy Valve.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- April, 2022
- Success Story - Ransom Everglades, USA (pdf - 954 KB)
Providence College incrementa l'efficienza presso la Schneider Arena
Le valvole a farfalla Belimo e i misuratori di portata forniscono una migliore visibilità e un controllo preciso.
Nel corso dei suoi quasi 50 anni di storia, l'arena da oltre 3000 posti è stata sottoposta a diverse ristrutturazioni per garantire che le sue strutture siano all'avanguardia. Uno dei processi di modernizzazione più recenti era volto a migliorare l'efficienza della macchina di raffreddamento responsabile del mantenimento della temperatura del ghiaccio. Lo scopo del lavoro ha compreso una revisione completa dell'impianto chiller. Belimo ha rivestito un ruolo cruciale nel progetto: alimentando misuratori di portata e valvole a farfalla a ultrasuoni che permettono di migliorare la visibilità e una regolazione della portata accurata.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole a farfalla, Sensori
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Misuratori di portata
- Messa in servizio:
- September, 2021
- Success Story - Providence College, USA (pdf - 2,34 MB)
Promenade Galleries, Linz (Austria)
Le soluzioni per la sicurezza Belimo contribuiscono in modo significativo alla protezione antincendio di un edificio speciale a Linz.
Nel centro di Linz, in Austria, le Promenade Galleries sono ubicate ora su una superficie di 12,000 m2. Qui gli edifici antichi, protetti come patrimonio, sono sapientemente combinati con l'architettura moderna, che offre uno stile di vita e di lavoro urbano e contemporaneo, oltre ad abitazioni esclusive in tutti gli spazi di utenza. Per il progetto Promenade Galleries, sei società di Linz hanno unito le loro forze sotto la guida dell'azienda di installazione elettrica ETECH per l'intera installazione tecnica dell'edificio. Oltre alle installazioni elettriche, alla completa tecnica di collegamento in rete e di controllo, anche la protezione antincendio è stata un elemento centrale all'inizio della progettazione. Oltre agli standard e alle direttive europei, l'Austria è anche conforme alle normative specifiche dello Stato, il che la rende uno dei paesi più all'avanguardia al mondo in materia di protezione antincendio. In tutti gli edifici con sistemi di allarme antincendio installati, le serrande tagliafuoco motorizzate sono obbligatorie e all'avanguardia
- Località:
- Austria
- Tipologia di edificio:
- Hotel, Edificio uffici, Edificio residenziale, Centro commerciale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Attuatori per serrande antincendio
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Attuatori per serrande di controllo fumi
- Referenze – Promenaden Galerien Linz, Austria (pdf - 2,34 MB)
Phoenix Contact, Tagelswangen (Svizzera)
Avere la certezza invece di supporre: massima efficienza energetica grazie a dati trasparenti.
La fondazione del Phoenix Contact in Germania risale a un secolo fa. Il leader globale e innovatore nei settori dell'elettrificazione, connessione e automazione dei processi industriali, energetici e infrastrutturali aiuta i partner a sviluppare applicazioni sostenibili con operazioni efficienti e costi ridotti. L'azienda impiega più di 22.000 persone in tutto il mondo e ha impianti di produzione in undici paesi. La sede della filiale svizzera, fondata nel 1981, ospita 80 dipendenti ed è stata costruita nel 1997 secondo elevati standard tecnici. Venticinque anni dopo il commissioning dell'edificio, i sistemi HVAC dovevano essere aggiornati in modo significativo per consentire un funzionamento più efficiente dal punto di vista energetico e fornire un eccellente comfort interno ai dipendenti. Avvalendosi di diversi partecipanti al progetto, Belimo ha supportato Phoenix Contact nella realizzazione di questa visione utilizzando dispositivi di campo intelligenti ed efficienti dal punto di vista energetico. Il risultato: sistemi comunicativi, portate energetiche trasparenti e funzionamento controllato per una qualità dell'aria interna sempre ottimale.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Attuatori, Portata dell'aria variabile (VAV), Sensori, Sensori da canale (aria), Sensori da tubazione (acqua)
- Prodotti:
- Energy Valve Belimo
- Prodotti:
- Attuatori per valvole a globo
- Prodotti:
- Portata dell'aria variabile (VAV)
- Prodotti:
- Sensori
- Referenze – Phoenix Contact, Svizzera (pdf - 2,16 MB)
Faro di Cordouan, Gironde (Francia)
Motorizzazione affidabile e duratura per edifici sempre attuali.
400 anni di storia.
Cordouan è stato costruito più di quattro secoli fa, su un isolotto di roccia in mare aperto, alla foce dell'estuario della Gironda. È talvolta chiamato il "faro dei re" o il "re dei fari". L'estuario della Gironda era un vero e proprio cimitero di navi e la messa in sicurezza delle rotte di navigazione divenne una priorità. Edoardo di Woodstock, principe di Aquitania, costruì una torre antincendio sull'isolotto di Cordouan, che fu chiamata la "Torre del Principe Nero". Questo fu l'inizio di 400 anni di storia.
- Località:
- Francia
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Attuatori per serrande (con funz. sicurezza)
- Prodotti:
- Attuatore LF
- Référence – Phare de Cordouan, Gironde, France (pdf - 2 MB)
Peachtree
PICCV Adds Long-Term Value to High-Rise Property in Mid-Town Atlanta
Roger Bennett was looking for an opportunity to showcase pressure-independent control valve technology to his clients. He found it when his firm, WayPoint Systems, was awarded the contract to provide a complete Direct Digital Control (DDC) system retrofit for a high-rise property in midtown Atlanta, known as 1100 Peachtree. The 582,000 square-foot, 28-storey class-A office building is managed by Carter and Associates.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valve
- Reference - Peachtree, USA (pdf - 147 KB)
Passeio 42 Building
Belimo’s Energy Valve brings zone temperature control and enhances chilled water efficiency.
The Passeio 42 building is 12 stories. Every floor is 12 thousand square feet, entirely serviced by a central Chilled Water Plant (CWP) with four air-condensed Chillers of 150 refrigeration tons supplying chilled water to fifty Air-Handling-Units (AHU) distributed through the floors. Every floor is individually controlled by a simple thermostat and pressure-dependent valve accompanied by a static balancing valve.
- Località:
- Brasile
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- April, 2022
- Success Story - Passeio 42 (pdf - 2,09 MB)
Ristorante panoramico Rothorn, Lenzerheide (Svizzera)
A circa 2,900 metri di altezza, sembra di essere al settimo cielo
Automazione e controllo per un maggiore comfort.
Il ristorante panoramico sulla vetta del Rothorn è una meta molto apprezzata sia d'inverno che d'estate. Grazie all'insuperabile posizione, i visitatori hanno una splendida vista sulla regione turistica di Lenzerheide e su oltre 1001 cime. Il ristorante vizia i suoi ospiti con una cucina regionale e casalinga. In seguito al successo della collaborazione nel progetto di costruzione del ristorante di montagna Scharmoin, nel ristorante panoramico sulla cima del Rothorn sono state installate diverse valvole di zona. Queste, a loro volta, sono state integrate nel sistema di gestione della Lenzerheide Bergbahnen AG. Ciò consente il controllo delle singole zone attraverso il sistema di gestione dell'edificio tramite la manutenzione a distanza. Come d'uso in molti ristoranti di montagna, la maggior parte del sistema HVAC di Lenzerheide è completamente automatizzato. La suddivisione del ristorante in diverse zone offre non solo il massimo livello di comfort per i visitatori, gli affittuari e i dipendenti, ma anche una grande flessibilità nell'utilizzo degli spazi, nonché trasparenza per quanto riguarda il fabbisogno energetico. Inoltre, l'isolamento delle zone inutilizzate consente un maggiore risparmio energetico.
- Località:
- Svizzera
- Tipologia di edificio:
- Ristorante
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Varietà di valvole di zona QCV
- Referenze – Panorama restaurant Rothorn summit, Svizzera (pdf - 1,42 MB)
Open Hybrid LabFactory, Wolfsburg (Germania)
Registrare il consumo di energia in base alla fonte e fatturarlo accuratamente.
Nuovi materiali e tecnologie di produzione per una mobilità sostenibile.
Il LeichtbauCampus Open Hybrid LabFactory (OHLF) di Wolfsburg, Germania, consente la ricerca e lo sviluppo di nuovi e innovativi concetti di costruzione leggera per le prossime generazioni di veicoli attraverso un nuovo modello di cooperazione. Le attività tecnologiche del campus di ricerca si concentrano sullo sviluppo simultaneo di materiali e tecnologie di produzione in sistemi multi-materiale per la costruzione ibrida leggera. L'OHLF è un progetto finanziato dal Ministero Federale Tedesco dell'Istruzione e della Ricerca nell'ambito dell'iniziativa di finanziamento "Campus di ricerca - Partnership pubblico-privata per l'innovazione". L'ampia superficie di 10,000 m2 è suddivisa in uffici, laboratori e centri tecnici e ospita inoltre le complesse attrezzature tecniche dell'edificio. Al centro dell'edificio si trova il centro tecnico di 2,100 m2, il cuore dell'OHLF. Il centro, alto più di tre piani, ospita gli impianti di produzione e le strutture per la costruzione e la simulazione.
- Località:
- Germania
- Tipologia di edificio:
- Fabbrica di ricerca
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole di regolazione indipendenti dalla pressione, Belimo Energy Valve™, Integrazione bus, Valvole di zona, Belimo Energy Valve™
- Prodotti:
- Prodotti:
- Prodotti:
- Prodotti:
- Referenze – Open Hybrid LabFactory, Germania (pdf - 2,01 MB)
Oklahoma City VA Hospital
New Generation Actuators and Retrofit Linkages Ease the Pain of DDC Conversion at Oklahoma City VA Hospital
The Oklahoma City VA hospital was the very first project to use the new generation actuators and linkages. The fact that ES2 was not only willing to wait for the product, but be the first to use it, is indicative of their confidence in Belimo technology and innovations. Neither Kinser nor Woods had any reservations about being the first to use the product. “Belimo has always given us awesome products and support. The actuators always perform as expected. Belimo is constantly looking for ways to improve their products. It is always been a great product for our customers”, said Kinser.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Retrofit
- Prodotti:
- Globe Valve Actuators
- Prodotti:
- Retrofit Linkages
- Reference - Oklahoma City Veterans Hospital, USA (pdf - 204 KB)
New York Post
Quality products and timely service get the job for Belimo Aircontrols at the New York Post
When the mechanical contracting group of The Trane Company won the bid from McClier Corporation to do the mechanical engineering for the new, state-of-the-art New York Post printing facility, its control design team chose Belimo as its supplier of actuators and valves. The decision was based on Belimo’s reputation for reliable products and timely, all-inclusive customer service.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Characterised Control Valves
- Reference - New York Post, USA (pdf - 206 KB)
Müller Produktions GmbH, Ungerhausen (Germania)
Green Factory 2.0: concentrarsi sull'energia
Nell'arco di 45 anni, l'Alois Müller Corporate Group si è trasformato: da azienda a conduzione familiare a un'azienda con circa 350 dipendenti. L'azienda è considerata specialista in ingegneria dei sistemi, energia e tecnologia dell'edificio (riscaldamento, ventilazione, igiene e condizionamento dell'aria). Ha dimostrato le sue ampie conoscenze applicative in diversi progetti, tra cui la nuova costruzione dell'Allianz Arena di Monaco di Baviera. Il suo progetto di punta è la Green Factory 2.0 di Ungerhausen (DE). Con una superficie totale di 18,000 m², è la più grande fabbrica verde virtualmente autosufficiente al mondo. Anche la produzione sostenibile ed efficiente dal punto di vista energetico è al centro dell'attenzione di BELIMO Automation AG. Con la nuova generazione di valvole a farfalla e di attuatori per valvole a farfalla con funzione di sicurezza PR e PRK (SuperCap), Müller ha trovato una soluzione per raggiungere i suoi obiettivi.
- Località:
- Germania
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole a farfalla
- Prodotti:
- 2 attuatori per valvole a farfalla retrofit (PRK) con SuperCap
- Prodotti:
- 2 combinazioni di attuatore per valvole a farfalla
- Report – Müller Produktions GmbH, Germany (pdf - 1,23 MB)
Rifugio Motta, Lenzerheide (Svizzera)
Monitoraggio dell'energia senza soluzione di continuità nel rifugio "simbolo" di Lenzerheide
Il nuovo rifugio Motta è il punto di riferimento per gli appassionati di sport invernali affamati e assetati.
Le ruspe per la demolizione del vecchio rifugio Motta sono arrivate nel 2017, appena dopo la chiusura delle piste e degli impianti di risalita del comprensorio sciistico di Arosa Lenzerheide. Il nuovo progetto di punta doveva essere pronto per l'inizio della stagione sciistica 2017/2018. Il nuovo rifugio Motta accoglie al suo interno 120 persone e altre 240 all'esterno nella sua ampia terrazza solarium su più livelli. L'innovativa costruzione con telaio in legno garantisce un ambiente rustico ma moderno, sia all'interno sia all'esterno. Questo fa del nuovo ski restaurant un progetto di punta internazionale e un'esperienza per tutti gli appassionati di sport sulla neve. Per garantire agli operatori del ristorante di poter prendersi cura adeguatamente dei loro ospiti, per il rifugio Motta è stato scelto ancora una volta un sistema HVAC con il massimo grado di automazione. Come per altri progetti, anche il sistema è stato equipaggiato con prodotti Belimo. La nuova gamma di sensori ha attirato l'attenzione tanto quanto la Belimo Energy Valve™ con connessione cloud.
- Località:
- Svizzera
- Tipologia di edificio:
- Ristorante
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Sensori, Valvole, Sistemi, Belimo Energy Valve™, Sensori da canale (aria), Sensori da esterno (aria)
- Prodotti:
- 7 Belimo Energy Valve™
- Prodotti:
- Vari sensori per temperatura, qualità dell'aria e pressione
- Referenze – Motta hut Lenzerheide, Svizzera (pdf - 2,01 MB)
Mission Event Center
Opened in April 2018, the Mission Event Center is a 40,000 square feet [3716 m²] , state-of-the-art commercial space located in the thriving city of Mission, Texas. To help enable this energy-saving functionality, the HVAC controls contractor for the Mission Event Center, Climatec, turned to Belimo. Climatec selected Belimo to supply multiple products for the HVAC system at the facility, including 25 variable air volume (VAV) damper actuators and two chilled water butterfly isolation valves. Sensors were also provided, including CO₂, air temperature, humidity, and water temperature.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Sensori, Attuatori, Valvole a farfalla
- Prodotti:
- Belimo Sensors: CO₂ for demand control ventilation
- Prodotti:
- Belimo Sensors: Air temperature, humidity, and water temperature
- Mission Event Center, Texas (pdf - 1,54 MB)
- belimo_mission_event_center_success-story_fr-ca.pdf (pdf - 1,55 MB)
- belimo_mission-event-center_success-story_pt-br.pdf (pdf - 1,55 MB)
- belimo_mission_event_center_success-story_es-mx.pdf (pdf - 1,54 MB)
Milano e Torino
The Milano e Torino business complex is located in the Água Branca neighborhood, in the West Zone of São Paulo, Brazil. The Milano e Torino complex includes four towers, each with 20 floors and 18 thousand square meters of usable space. The towers have their own respective chilled water plants with four 160-ton air condensing chillers (640 tons of capacity). The installation of 172 Energy Valves (in combination with other building upgrades made to the automation system and cooling water pumps) increased chilled water Delta T within the four buildings from 6.5°F [3.6°C] to 11.7°F [6.5°C]. This resulted in a nearly 40% reduction in energy consumption of the air conditioning system.
- Località:
- Brasile
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Prodotti:
- Energy Valves
- Success Story - Milano e Torino Complex, Brazil (pdf - 1,88 MB)
Maximising energy efficiency and ensuring patient comfort
Belimo Energy Valve Enables Data-driven Optimization of University of Florida’s Shands Cardiovascular Hospital
Patient Comfort University of Florida (UF) Health Shands Hospital is a top-tier academic medical center and prides itself on the energy efficiency of its facilities. Several Shands buildings have received ENERGY STAR® certification from the U.S. Environmental Protection Agency (EPA). The Energy Services group at the hospital is responsible for energy management initiatives, policies and procedures, and best practices for state-funded facilities on the main campus, including UF’s Health Science Center. The unit also provides technical guidance on new construction projects and implements energy conservation and optimisation strategies in the hospital’s buildings. The team employs a highly digitalised approach to commissioning, operation, and maintenance of building and HVAC systems to fulfill its duties. For this, they rely heavily on the transparency provided by Belimo Energy Valves.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- April, 2022
- Success Story - Shands Hospital, USA (pdf - 694 KB)
Massachusetts Institute of Technology
MIT Tests New Energy Valve Technology at Charles Hayden Library And Reaps the Rewards of Higher Delta-T!
Low Delta-T Syndrome is a common (and costly) problem in many large facilities, especially on sprawling campuses with central chilled water plants. This was and still is the case at the Massachusetts Institute of Technology (MIT). But the problem is not as bad as it used to be. Facility engineers within the University’s Sustainability and Utility Planning are now optimistic that it will continue to improve. This is in thanks to new valve technology from Belimo that was applied to MIT’s Charles Hayden Library as a beta test for a new Belimo product – the Belimo Energy Valve™. The results are promising for any large facility currently battling Low Delta-T Syndrome.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valves
- Reference - Massachusetts Institute of Technology, USA (pdf - 2,39 MB)
Marriott Hotel "Al Jaddaf", Dubai (EAU)
5 stelle per l'efficienza energetica al Marriott Hotel Al Jaddaf di Dubai
La catena Marriott Hotel ha avviato la sua esperienza alberghiera a Dubai, negli Emirati Arabi Uniti, il 15 gennaio 2014. Con uno splendido design e una posizione perfetta ad Al Jaddaf, questo hotel a 5 stelle è dotato di numerosi e raffinati servizi. Questi comprendono camere di lusso completamente automatizzate e sistemazioni in suite che favoriscono il relax, con biancheria da letto di lusso, bagni in marmo, Internet ad alta velocità e TV a schermo piatto, nonché una vista sullo skyline di Dubai. L'hotel offre 352 camere di lusso e 128 appartamenti. I prodotti Belimo sono stati implementati in modo efficiente e consentono un sistema sostenibile e privo di manutenzione.
- Località:
- Emirati Arabi Uniti
- Tipologia di edificio:
- Hotel
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Belimo Energy Valve™
- Prodotti:
- 3 Belimo Energy Valve™
- Prodotti:
- 9 valvole di regolazione elettroniche indipendenti dalla pressione (EPIV)
- Prodotti:
- 1088 valvole di regolazione indipendenti dalla pressione (PICCV)
- Referenze – Marriott Hotel «Al Jaddaf», EAU (pdf - 2,12 MB)
Loxone Campus, Kollerschlag (Austria)
Nell'epicentro della building automation intelligente – Un progetto vetrina per imparare e sperimentare.
In qualità di specialista di soluzioni di building automation intelligenti, Loxone supporta dal 2009 progettisti specializzati, architetti e proprietari di edifici nella realizzazione dei loro progetti edilizi. Con l'aiuto dei suoi oltre 25,000 partner in tutto il mondo, Loxone ha già realizzato più di 250,000 progetti. Fondata nel 2009 a Kollerschlag, in Austria, la missione dell'azienda è quella di servirsi dell'automazione per creare edifici più efficienti dal punto di vista energetico, confortevoli e sicuri. Costruito nel 2023 nello stesso luogo in cui è stata fondata l'azienda, lo scopo del Loxone Campus è quello di rendere possibile oggi l'esperienza della building automation di domani. Il complesso di 15 ettari comprende un hotel comprensivo di un centro benessere, un auditorium, un ristorante, diversi uffici e magazzini. Mostra ai visitatori come sarà il lavoro e la vita in futuro. L'intero sistema di riscaldamento, raffreddamento e ventilazione del Loxone Campus è stato progettato per essere automatizzato e controllato in base alla domanda, motivo per cui sono stati utilizzati numerosi componenti HVAC comunicativi di Belimo. I vantaggi per te: integrazione semplice nel sistema di gestione dell'edificio, funzionamento efficiente dal punto di vista energetico e massimo comfort nell'edificio. Le interfacce Belimo Tree e Air consentono una perfetta integrazione dei dispositivi.
- Località:
- Austria
- Tipologia di edificio:
- Hotel, Edificio uffici, Ristorante, Edificio di stoccaggio
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Valvole di zona, Sensori, Thermal Energy Meters, Attuatori, Portata dell'aria variabile (VAV)
- Prodotti:
- Belimo Energy Valve con contatore di energia termica
- Prodotti:
- EPIV a 6 vie
- Prodotti:
- PIQCVs
- Prodotti:
- Attuatori per serrande di ventilazione
- Prodotti:
- Portata dell'aria variabile
- Prodotti:
- Sensori
- Messa in servizio:
- November, 2023
- Referenze – Loxone Campus, Austria (pdf - 2,32 MB)
Liuzhou SoReal Spiral Paradise (Cina)
Fornire aria di qualità e comfort al mondo virtuale.
"Abbiamo bisogno di sensori accurati con tempi di risposta rapidi per salvaguardare la qualità dell'aria interna per tutte le persone", ha detto Pang Yong, direttore generale di Wuji Industrial - installatore del primo parco a tema di realtà virtuale (VR) nella Cina meridionale.
Con oltre cento sensori e Energy Valve, Belimo ha sviluppato una soluzione HVAC all'avanguardia per compensare dinamicamente il volume sempre mutevole delle persone e per fornire un controllo affidabile della qualità dell'aria e del comfort termico in ogni stanza, ad ogni livello.
- Località:
- Cina
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Belimo Energy Valve™, Attuatori, Valvole a farfalla, Sensori
- Prodotti:
- Energy valve
- Prodotti:
- Valvole a farfalla
- Prodotti:
- Attuatori
- Prodotti:
- Sensori di temperatura, umidità, CO2, pressione e pressione differenziale
- Reference - SoReal Spiral Paradise, China (pdf - 2,21 MB)
Lincoln Hall Middle School
Belimo Bridges the Gap Between Proprietary Control System and Control Valves at Middle School
One teacher threatened to wear a bathing suit to class (in mid-winter) if the overheating problem at the Lincoln Hall Middle School in Lincolnwood, Illinois was not soon corrected. Clearly, it is hard enough to make a 13-year old concentrate; and even though Jim Caldwell, Director of Buildings & Grounds was pretty sure this was an idle (and good-humoured) threat, the school was ready to find a control solution for the unit ventilators that were overheating several classrooms.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valve
- Prodotti:
- Characterised Control Valve
- Reference - Lincoln Hall Middle School, USA (pdf - 241 KB)
Struttura ricreativa "Happyland", Klosterneuburg (Austria)
EPIV – Soluzione sostenibile ed efficiente dal punto di vista energetico per "Happyland"
"Happyland" a Klosterneuburg (Austria) offre una vasta gamma di attività per il tempo libero per tutte le età, tra cui una piscina benessere coperta, una grande piscina sportiva all'aperto, diversi campi da gioco e una grande area sauna. Nel 2013 il gestore ha deciso di intraprendere importanti lavori di ristrutturazione, ampliamento e modifica. Sono stati utilizzati sistemi tecnici all'avanguardia, ad esempio per rinnovare il sistema di distribuzione del riscaldamento e il complesso sistema di ventilazione. Particolare importanza è stata data alla perfetta tecnologia di controllo. L'EPIV – uno dei prodotti innovativi di Belimo – è stato più che all'altezza del suo ruolo di "problem-solver" in questo progetto.
- Località:
- Austria
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- 45 valvole di regolazione elettroniche indipendenti dalla pressione (EPIV)
- Referenze – Leisure facility “Happyland”, Austria (pdf - 1,68 MB)
Legend Palace Hotel
Most successful energy valve job in Belimo Asia Pacific
The Hotel Legend Palace is one of the prestige hotel in the Macau Fisherman's Wharf hotel resort right next to the Macau Harbour Ferry Terminal. The complex includes a few 5 star hotels, entertainment facilities, convention centres and lots of fine quality restaurants. The Legend Palace Hotel was completed in 2017. This project is the biggest single new development project using the most number of energy valves in Asia Pacific so far. Belimo Hong Kong got involved in the early design stage of the project.
The vice president of the facility management appreciated the unique functionality of the energy valve, and committed to use it as the standard product in this project.
Getting the best support from owners, consultants, contractors, and more importantly from the Belimo top management. Belimo Hong Kong could win the project from the fierce overseas and local competitors.
- Località:
- Cina
- Tipologia di edificio:
- Hotel
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori per serrande antincendio, Valvole di regolazione indipendenti dalla pressione, Attuatori per serrande (senza funz. sicurezza), Valvole a farfalla, Belimo Energy Valve™
- Prodotti:
- Pressure independent quick compact valve: 2000 sets
- Prodotti:
- Energy valve: 110 sets
- Prodotti:
- Butterfly valve: 50 sets
- Prodotti:
- Damper actuators and fire and smoke damper actuators: 2000 sets
LDR Médical, Troyes (Francia)
Controllo e bilanciamento della portata di riscaldamento e raffreddamento in travi fredde
Nel 2016 la società franco-americana LDR, specializzata in impianti spinali e protesi discali toraco-lombari, si è trasferita nella nuova sede aziendale nel parco industriale "Parc du Grand Troyes" (Département Aube). Il progetto di costruzione, con costi per un totale di 13 milioni di euro e una superficie di 7000 m², è stato guidato da Linkcity che, su una nota correlata, ha poi realizzato il suo primo progetto di pianificazione e costruzione nella regione di Champagne. I lavori di costruzione di Bouygues Bâtiment Nord-Est sono iniziati all'inizio del 2015. Una parte dell'edificio è destinata all'amministrazione e l'altra alla logistica.
- Località:
- Francia
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di zona
- Prodotti:
- 163 valvole di zona 6-vie indipendenti dalla pressione
- Prodotti:
- 26 valvole di zona 6-vie
- Prodotti:
- 17 valvole di zona indipendenti dalla pressione PIQCV
- Referenze – LDR Médical, Francia (pdf - 1,88 MB)
Kroon Hall, Yale University
Actuator Retrofit at Yale University’s Kroon Hall Demonstrates Nothing is Greener Than Reliability
“Replacing the actuators was a matter of taking the old one off and putting the new one on. It took about one hour per valve and the system was up and running again”, said Mr. Beauton. This means less down time and less repair costs.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Retrofit
- Prodotti:
- Ball Valve Retrofit
- Reference - Kroon Hall, Yale University, USA (pdf - 986 KB)
Konvekta AG, St. Gallen (Switzerland)
Maximum energy efficiency with reliable components.
Konvekta is a global technology leader in the fi eld of high-performance energy recovery for ventilation and air-conditioning systems. Founded in St. Gallen (Switzerland) in 1949, the company offers precisely coordinated components from a single source that are developed and produced specifi cally for their application and optimised as an overall system. Thanks to mathematical modelling, the reliability of the performance data and energy recovery is guaranteed.
The partnership between Konvekta and Belimo dates back to more than two decades and continues today. Actuators, valves, and sensors from Belimo are being used for two of the four core components in Konvekta’s portfolio, namely the hydronic assembly and the heat exchanger. With their uncompromising reliability and maximum energy effi ciency, the fi eld devices contribute to the optimum operation of the Konvekta systems.
- Località:
- Svizzera
- Tipologia di edificio:
- Aereoporto, Ospedale, Hotel, Scuole / università, Impianto di produzione, Fabbrica di ricerca
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione a sfera (CCV), Valvole a globo, Valvole a farfalla
- Prodotti:
- Characterised control valves with modulating valve actuator
- Prodotti:
- 3-way characterised control valves
- Prodotti:
- 3-way globe valves
- Prodotti:
- Motorised butterfly valve actuators
- Messa in servizio:
- January, 2024
- Referenze – Konvekta AG, Svizzera (pdf - 7,56 MB)
Gruppo KION, Francoforte sul Meno (Germania)
Le valvole di zona elettroniche indipendenti dalla pressione EPIV a 6 vie controllano la portata dell'acqua calda e dell'acqua fredda.
Un comfort ambiente costantemente piacevole per tutte le zone dell'edificio.
Il Gruppo KION è uno dei fornitori leader al mondo di carrelli elevatori, tecnologia per la logistica e soluzioni automatizzate per la filiera di approvvigionamento. Più di 36.000 dipendenti in oltre 100 paesi fanno parte del Gruppo KION attivo e delle sue unità operative.
Dall'autunno 2017, il Gruppo KION gestisce le sue operazioni globali dalla sua sede centrale nel quartiere di Gateway Gardens all'aeroporto di Francoforte. L'edificio per uffici possiede sette piani superiori e due piani interrati con parcheggio sotterraneo. Sono stati realizzati interni moderni con un'area uffici open space per un totale di 270 posti di lavoro, sulla base degli studi dell'Istituto Fraunhofer per l'ingegneria industriale IAO e di aconsea GmbH.
- Località:
- Germania
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Valvole a zona elettroniche indipendenti dalla pressione EPIV a 6 vie
- Messa in servizio:
- January, 2017
- Referenze – KION Group Frankfurt, Germania (pdf - 1,97 MB)
Kenny's Flagship Store, Dietikon (Svizzera)
Efficienza energetica grazie alle energie rinnovabili.
Da uno storico edificio industriale a uno dei concessionari auto più moderni e sostenibili della Svizzera: il nuovo flagship store dell'azienda familiare svizzera di seconda generazione "Kenny's Auto-Center" si estende su una superficie di oltre 6.200 m² e comprende una grande officina, un moderno showroom e un bar interno. L'edificio, che è stato inaugurato nel 2022, è stato progettato per essere a zero emissioni di CO2 e sarà alimentato da sonde geotermiche e da un impianto solare di 2.000 m². Quest'ultimo ha una potenza di picco di 500 kWp e, oltre ad alimentare l'edificio, fornirà anche il fabbisogno energetico di 30 stazioni di ricarica per veicoli, producendo energia in eccesso durante i mesi estivi e alimentando i veicoli elettrici.
Belimo ha fornito una gamma di prodotti per i sistemi HVAC del flagship store, tra cui valvole di regolazione elettroniche indipendenti dalla pressione, valvole di zona e sensori da condotto che, grazie alla connettività e alla configurazione in fabbrica, hanno ridotto al minimo i tempi di installazione. La progettazione HVAC è stata eseguita da Virtuos 3D Modelling AG e l'integrazione del sistema da gatec AG.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Valvole di zona, Sensori, Sensori da canale (aria), Attuatori, Attuatori per serrande (senza funz. sicurezza)
- Prodotti:
- Valvole di regolazione elettroniche indipendenti dalla pressione (EPIV)
- Prodotti:
- Valvole di zona Modbus
- Prodotti:
- Sensori da condotto per pressione dell'aria e differenziale
- Prodotti:
- Monitor antigelo
- Prodotti:
- Attuatori rotativi
- Messa in servizio:
- January, 2023
- Referenze – Kenny's Flagship Store, Svizzera (pdf - 2,1 MB)
Kainuu Central Hospital, Kajaani (Finland)
Innovative building technology solutions in Kainuu Central Hospital
Caverion implemented the hospital and building systems for the new Kainuu Central Hospital, utilizing products from Belimo, among others. Finland’s first hospital project executed under the alliance model was completed in phases, with the final section finished in 2021.
“We were able to influence the solutions for this project already during the planning phase. With our product choices, we steered the project in a life-cycle friendly and phased commissioning direction. To enable the hospital to be commissioned as quickly as possible, we selected Belimo’s innovative valves for the site. The cooperation with Belimo went smoothly from planning to implementation,” says Timo Malinen, Project Manager at Caverion.
- Località:
- Finlandia
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Belimo Energy Valve™, Valvole di zona, Attuatori, Attuatori per serrande (senza funz. sicurezza), Attuatori per serrande (con funz. sicurezza)
- Prodotti:
- 6-way EPIVs
- Prodotti:
- PIQCVs
- Prodotti:
- Belimo Energy Valve™
- Prodotti:
- Damper actuators
- Messa in servizio:
- January, 2021
- Referenze – Kainuu Central Hospital, Finlandia (pdf - 4,66 MB)
Johnson GEO CENTRE
In 2002, the GEO CENTRE in St. John’s, Newfoundland and Labrador, Canada opened its doors to the visitors and since then offers many attractions to explore the geological history of the region and the planet. Due to its interesting environment, in the middle of rocks, and the fact that the building usually needs to be heated and cooled at the same time, it is a very interesting place from the HVAC point of view as well. The HVAC system was continuously optimised and after about 15 years of operation, Belimo Energy Valves were installed together with VFD’s for some pumps. This optimisation led to energy savings in the range of 20%, which saves up to C$20,000 per year.
- Località:
- Canada
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valve
- Success Story - Johnson Geo Centre, USA (pdf - 2,46 MB)
Ospedali di Izmir e Kocaeli, Izmir / Kocaeli (Turchia)
Garantire un ambiente sicuro e salubre dove è maggiormente necessario.
Per migliorare le infrastrutture sanitarie in Turchia, sono stati costruiti due ospedali all'avanguardia in due grandi regioni metropolitane del Paese, Izmir e Kocaeli. L'ospedale di Izmir è composto da otto edifici con una superficie interna di 633.020 m² e 2.060 posti letto. L'ospedale di Kocaeli, composto da quattro edifici, ha una superficie interna totale di 383.397 m² ed è dotato di 1.207 posti letto. Gli ospedali sono tra le strutture più critiche per quanto riguarda il riscaldamento, il raffreddamento e la ventilazione. Di conseguenza, è fondamentale mantenere sempre una qualità dell'aria interna ottimale e la massima affidabilità dei sistemi HVAC. Per garantire ciò, Belimo ha fornito più di 20.000 sensori per monitorare e controllare quasi tutte le aree dei due ospedali. Gli attuatori VAV Belimo contribuiscono a mantenere la qualità dell'aria interna richiesta da ciascuna zona nelle due strutture. Allo stesso tempo, i nostri attuatori per serrande tagliafuoco e di controllo fumi garantiscono la massima sicurezza in caso di incendio.
- Località:
- Turchia
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Attuatori per serrande (con funz. sicurezza), Portata dell'aria variabile (VAV), Attuatori per serrande antincendio, Valvole, Valvole a farfalla, Sensori
- Prodotti:
- Vari sensori
- Prodotti:
- Attuatori VAV
- Prodotti:
- Attuatori per serrande
- Prodotti:
- Valvole a farfalla 3-vie
- Prodotti:
- Attuatori per serrande tagliafuoco
- Prodotti:
- Attuatori per serrande di controllo fumi
- Referenze – Izmir and Kocaeli Hospitals, Turchia (pdf - 1,74 MB)
Istituto forestale, Skopje (Macedonia del Nord)
Efficienza energetica attraverso un monitoraggio trasparente del sistema
I prodotti Belimo "Energy Valve" e il termoregolatore ambiente "CR24-B1" sono stati i protagonisti di un progetto pilota macedone a Skopje per la realizzazione di edifici ad alta efficienza energetica. L'impostazione sperimentale dell'Istituto forestale ha potuto dimostrare che, con l'attuazione di significative misure di rinnovamento, il consumo di energia primaria poteva essere ridotto del 20% entro il 2020 rispetto alle aspettative previste per il 2007, come delineato dalla Direttiva 2012/27/UE. Grazie alla Belimo Energy Valve™, i valori attuali di consumo energetico e il potenziale di ottimizzazione del sistema sono sempre noti.
- Località:
- Macedonia del Nord
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Sistemi, Belimo Energy Valve™
- Prodotti:
- Belimo Energy Valve™
- Prodotti:
- Regolatore ambiente CR-24-B
- Referenze – Institute of Forestry, Macedonia del Nord (pdf - 769 KB)
Improved air quality for a healthier environment
Collège Laval a Class Act Continues to Make a Big Impact on Unparalleled Education
Collège Laval maintains an unparalleled quality of education by taking the health of its students and staff very seriously. By installing 115 smart room sensors within the college, it is now possible to precisely detect air quality in real-time, even from a smartphone. To achieve this, the college staff worked together with Immotik, a distributor, installer, and integrator of BACnet products, to select and install a network of sensors in the six wings of the college. Every sensor can be scanned quickly and easily to access data in real-time, without prior calibration, via the Belimo Assistant App and a smartphone. It also allows field adjustment, commissioning, and troubleshooting even without power.
- Località:
- Canada
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Sensori
- Messa in servizio:
- August, 2022
- Reference - College Laval, Canada (pdf - 1,43 MB)
HUG AG, Malters (Svizzera)
Sostenibilità dal profondo con i dispositivi di campo Belimo.
Il gruppo di prodotti da forno HUG è noto per i suoi prodotti pregiati e di alta qualità e con i suoi marchi HUG, DAR-VIDA e Wernli è sinonimo di sostenibilità e Swissness.
Nel 2020 è stato dato il via alla fusione delle sedi di produzione di WERNLI a Trimbach e HUG a Malters con il nuovo edificio "Backhaus" a Malters. In questo progetto generazionale, era molto importante per l'azienda ottenere miglioramenti ecologici in relazione alla produzione. I dispositivi di campo Belimo hanno dato un importante contributo in questo senso.
La progettazione dei sistemi HVAC è stata effettuata da Anex Ingenieure. L'integratore di sistemi era CKW Conex AG.
- Località:
- Svizzera
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Sensori, Sensori ambiente (aria), Sensori da canale (aria), Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Sensori di pressione
- Prodotti:
- Sensori ambiente
- Prodotti:
- Valvole di regolazione indipendenti dalla pressione
- Referenze – HUG AG, Svizzera (pdf - 2,63 MB)
HPW Fresh & Dry SARL, Assé (Costa d'Avorio)
Soluzioni eccellenti per una produzione sostenibile.
In Belimo siamo orgogliosi di fornire tecnologie innovative e testate, adatte ad un'ampia gamma di applicazioni HVAC in tutto il mondo. La partnership tra noi e HPW Fresh & Dry (HPW) in Africa occidentale è un esempio straordinario di come, avvalendosi delle nostre soluzioni di prim'ordine, sia possibile migliorare la sostenibilità della produzione.
- Località:
- Costa d'Avorio
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Attuatori, Attuatori per serrande (con funz. sicurezza), Valvole, Valvole di regolazione a sfera (CCV), Retrofit, Valvola di regolazione / attuatori, Sensori, Sensori da canale (aria), Valvole a globo
- Prodotti:
- Attuatori
- Prodotti:
- Valvole a 2 e 3 vie
- Prodotti:
- Messa in servizio:
- December, 2019
- Referenze – HPW Fresh & Dry SARL, Costa d'Avorio (pdf - 2,18 MB)
Casa di Läderach, Bilten (Svizzera)
Massima flessibilità e comfort ottimale con un fabbisogno energetico minimo.
Fondata nel 1962, Läderach AG (Svizzera) è una cioccolateria a conduzione familiare giunta alla terza generazione. Il suo ultimo prestigioso progetto è la "House of Läderach", costruita nel 2012 accanto allo stabilimento di produzione dell'azienda a Bilten. La Casa di Läderach offre un mondo di esperienze composto da un impianto di produzione dal vivo, un negozio, un caffè, una fontana di cioccolato alta tre metri e visite guidate interattive. Il nuovo edificio ospita anche diverse sale per eventi, uffici individuali e uffici open space.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici, Impianto di produzione
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Attuatori, Portata dell'aria variabile (VAV), Valvole, Valvole di zona, Valvole a globo, Sensori
- Prodotti:
- Diversi attuatori
- Prodotti:
- Valvole 6-vie
- Prodotti:
- Valvole a globo
- Prodotti:
- Vari sensori
- Messa in servizio:
- November, 2020
- Referenze – House of Läderach, Bilten, Svizzera (pdf - 2,57 MB)
Hillsdale College
Belimo Energy Valve Helps Hillsdale College Meet Strategic Energy Goals
Hillsdale’s Energy Department implemented an energy management program in an effort to reduce the costs associated with providing utility services to the campus. The primary goal of the plan was to help the college absorb potential utility rate hikes while avoiding the need to increase its utility budget as both newly constructed and renovated facilities were completed and became occupied. After roughly a year and a half of trying to achieve savings, the college’s Energy Department examined the operation of their HVAC systems and related mechanical equipment to identify areas where more substantial savings could be achieved through both system optimisation and various infrastructure improvements.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valves
- Reference - Hillsdale College, USA (pdf - 389 KB)
Grattacielo a Tscharnergut, Berna (Svizzera)
Estrazione fumi per le vie di fuga e di salvataggio negli edifici esistenti.
Lo sviluppo nel quartiere Tscharnergut di Berna è stato il più grande progetto abitativo della Svizzera alla fine degli anni Cinquanta. Nell'ambito di una ristrutturazione completa dell'immobile, dalla fine di marzo 2021 sono stati installati i cosiddetti sistemi a pressione differenziale (PDS) in tre dei quattro edifici di venti piani occupati.
Un PDS è un dispositivo tecnico installato in modo permanente negli edifici. In caso di incendio, ha il compito di mantenere libere dal fumo le vie di fuga e di salvataggio, ad esempio le scale o i vani degli ascensori dei vigili del fuoco, grazie a una sovrapressione controllata.
Le esigenze del cliente sono state soddisfatte in modo ottimale grazie all'utilizzo dei prodotti Belimo. Il cliente era FAMBAU Genossenschaft Bern, il consulente di progettazione PDS era la società Enfors AG di Sempach. Hautle Anderegg und Partner AG è stata responsabile della pianificazione dell'esecuzione e dell'implementazione del concetto di protezione antincendio.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio residenziale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Attuatori, Attuatori per serrande (con funz. sicurezza), Attuatori per serrande (a corsa veloce), Sensori, Sensori da canale (aria)
- Prodotti:
- Sonda di pressione differenziale per aria
- Prodotti:
- Attuatore rotativo a corsa molto rapida
- Prodotti:
- Attuatore rotativo con funzione di sicurezza
- Messa in servizio:
- January, 2021
- Referenze – High-rise building Tscharnergut Bern, Svizzera (pdf - 1,87 MB)
Hagl GmbH, Gütlsdorf / Attenkirchen (Germania)
Riduzione del consumo di energia e delle emissioni nocive
Portare l'energia termica dove può essere utilizzata. Con Belimo Energy Valve™.
Non è solo l'aumento dei prezzi dell'energia che rende sempre più interessante per le aziende il recupero del calore. La Hagl GmbH di Gütlsdorf / Attenkirchen, che con 130 dipendenti opera con successo da oltre 25 anni nel settore della lavorazione della lamiera e della lavorazione del metallo, ha dimostrato il coraggio di adottare nuove idee nell'utilizzo di fonti energetiche alternative e nel miglioramento dell'efficienza energetica. Ad esempio, ha già installato un impianto a pozzo con pompa di calore, un impianto fotovoltaico, la generazione di acqua calda attraverso un impianto di evaporazione fuso nella piastra base e ha costruito un sistema di riscaldamento a parete per il riscaldamento e il raffreddamento. L'ultimo progetto di Hagl è il sistema di recupero calore sulle presse idrauliche per il riscaldamento degli edifici aziendali. La Belimo Energy Valve™ ha la responsabilità di garantire che le portate, le temperature di alimentazione e di ritorno e il recupero di energia sulle presse possano essere regolati, registrati e valutati.
- Località:
- Germania
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Sistemi, Valvole, Attuatori, Sensori, Belimo Energy Valve™, Sensori da canale (aria)
- Prodotti:
- Belimo Energy Valve™
- Prodotti:
- Valvole di regolazione a 2 e 3-vie
- Prodotti:
- Attuatori rotativi
- Prodotti:
- Sensori
- Prodotti:
- Belimo MP-Bus
- Referenze – Hagl GmbH, Germania (pdf - 1,52 MB)
Habitat for Humanity
Habitat for Humanity Home Utilises Belimo CCV™ Valves to Complete Innovative Designs
Habitat for Humanity in Riverside, CA has raised the bar on energy efficient residential design with a unique system that uses one heat source - a tankless boiler - for both domestic hot water and radiant floor heating. Peter "Rugg" Lehrbass, a Facilities & Planning Services engineer at California Baptist University was called upon and volunteered his design services for the Habitat home, which is on track to become Habitat’s first LEED platinum certified home.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio residenziale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole
- Prodotti:
- Characterised Control Valve
- Reference - Habitat for Humanity, USA (pdf - 525 KB)
Edificio GENO-Haus, Stoccarda (Germania)
"Business as usual" durante gli aggiornamenti a risparmio energetico per le unità a induzione
Approssimativamente 1200 unità a induzione nell'edificio GENO-Haus di Stoccarda sono state sostituite con modelli più recenti e sia il circuito di acqua fredda sia quello di acqua calda sono stati dotati di 2342 valvole di zona con chiusura a tenuta QCV (Quick Compact Valve) di Belimo. L'edificio, costruito nel 1970, è stato convertito piano per piano in modo da ridurre al minimo i disagi nei luoghi di lavoro interessati.
- Località:
- Germania
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di zona
- Prodotti:
- 2342 valvole di zona (QCV)
- Referenze – GENO-Haus Building, Germania (pdf - 2,26 MB)
Galliker Transport AG, Dagmersellen (Svizzera)
Dove precisione e flessibilità vanno di pari passo
Il nuovo Logistikcenter 4 di Galliker Transport AG di Dagmersellen offre un'efficienza energetica senza pari. Per quanto riguarda la tecnologia del calore, l'intero centro logistico è totalmente autonomo e sta quindi fissando nuovi standard in materia di tecnologia ambientale e sostenibilità. I prodotti alimentari ma anche farmaceutici possono essere conservati in condizioni di stoccaggio ideali in un'area di 22,000 metri quadrati in un magazzino automatizzato per surgelati, un magazzino a scaffalature alte e vari spazi di stoccaggio con diverse zone di temperatura.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici, Edificio di stoccaggio
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Circa 200 valvole di regolazione elettroniche indipendenti dalla pressione (EPIV)
- Prodotti:
- Varie valvole a globo e a farfalla
- Report – Galliker Transport AG, Switzerland (pdf - 3,21 MB)
Fortum Power & Heat, Breslavia (Polonia)
Comoda modernizzazione per ottenere la massima affidabilità e sicurezza
Fortum Power & Heat è un'azienda leader nel settore delle energie pulite che fornisce elettricità, riscaldamento e raffreddamento, oltre a soluzioni intelligenti per migliorare l'efficienza delle risorse. Con una produzione 28 TWh nel 2016, Fortum è uno dei maggiori produttori di calore a livello mondiale. In Polonia, uno dei suoi mercati, Fortum gestisce oltre 800 km di reti di teleriscaldamento che servono circa 360,000 famiglie. Nella sola Breslavia, la più grande città della Polonia occidentale, ci sono circa 520 km con 5,200 sottostazioni di teleriscaldamento in funzione, di cui 3,500 di proprietà di Fortum. Nel 2014 si è deciso di iniziare a modernizzare queste sottostazioni. Con l'obiettivo di ottenere la massima affidabilità, Fortum ha scelto il retrofit degli attuatori per valvole a globo con funzione di sicurezza elettronica (SuperCap) di Belimo.
- Località:
- Polonia
- Tipologia di edificio:
- Teleriscaldamento
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Retrofit, Valvola a globo / attuatori
- Prodotti:
- > 700 attuatori per valvole a globo retrofit
- Referenze – Fortum's district heating substations, Polonia (pdf - 2,23 MB)
Fort Belvoir Hospital
Southland Industries Discovers Labour-Saving Value of New Linkage Technology at Fort Belvoir Hospital
Andy Cummings of Southland Industries has suffered through his share of cumbersome damper actuator installs. With over 30 years of experience in the sheet metal industry, he knows that the process is not only time consuming, it can yield disappointing results if the connections are in any way unstable. Damper blades can become twisted or bent, linkages can bend or even break, etc. Meanwhile, the last thing a busy design, build and maintenance firm like Southland Industries wants is to revisit a failed installation that was already labour intensive to begin with!
- Località:
- Stati Uniti
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Retrofit
- Prodotti:
- ZG-JSL Jackshafts
- Reference - Fort Belvoir Hosptial, USA (pdf - 220 KB)
Floating Office, Rotterdam (Paesi Bassi)
Cavalcare l'onda del cambiamento climatico.
Una delle sfide maggiori che deve affrontare il settore delle costruzioni è quella di creare soluzioni resistenti alle intemperie con la massima efficienza energetica. Ne è un esempio eccellente il Floating Office di Rotterdam (FOR), che è stato progettato e realizzato da Powerhouse Company. L'edificio è stato costruito su 15 blocchi di cemento che gli consentono di galleggiare sul fiume Mosa e utilizza le sue acque per il raffreddamento e il riscaldamento. Il FOR mira a riflettere i valori del suo locatario principale, il Global Center of Adaptation (GCA), un'organizzazione che promuove tecnologie ecologiche e incoraggia un approccio incentrato sul clima nelle fasi di pianificazione e investimento. I sistemi HVAC rappresentano una parte consistente del consumo energetico di un edificio, motivo per cui Powerhouse ha scelto di collaborare con Belimo. Insieme a Powerhouse e al Roodenburg Groep, responsabile dell'installazione, siamo riusciti a garantire un comfort ambiente ottimale in tutto l'edificio, in qualsiasi momento, con l'aiuto di un uso controllato del fabbisogno energetico. Così facendo, abbiamo contribuito a rendere il FOR il primo floating office al mondo a zero emissioni.
- Località:
- Olanda
- Tipologia di edificio:
- Edificio uffici, Ristorante
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Attuatori, Portata dell'aria variabile (VAV), Sensori, Sensori da canale (aria)
- Prodotti:
- Energy Valve Belimo
- Prodotti:
- Valvole 6-vie
- Prodotti:
- Portata dell'aria variabile (VAV)
- Prodotti:
- Sensori
- Messa in servizio:
- January, 2022
- Referenze – Floating Office Rotterdam, Paesi Bassi (pdf - 1,63 MB)
Ethias, Hasselt (Belgio)
Ethias punta a diventare un'azienda a zero emissioni di carbonio entro il 2030
Ethias, una delle maggiori compagnie assicurative belghe, punta a diventare un'azienda a zero emissioni di carbonio entro il 2030. Per raggiungere questo obiettivo, Ethias ha sottoposto la sua sede fiamminga di Hasselt, che si estende su una superficie di circa 10.000 m², a un profondo rinnovamento dell'efficienza energetica.
L'installatore generale ha chiesto a Mourik di occuparsi della climatizzazione perché, in quanto azienda dinamica, era fortemente impegnata nell'innovazione.
L'energia proviene da un impianto di immagazzinamento di freddo/calore. Questo comporta l'estrazione di calore dal terreno in inverno e di freddo durante il periodo estivo. Una pompa di calore distribuisce ulteriormente l'energia in tutto l'edificio, mentre i pannelli solari sul tetto forniscono elettricità alla pompa di calore.
È ovviamente molto importante che questa preziosa energia venga utilizzata per regolare il clima interno nel modo più efficiente possibile. È proprio questo il valore aggiunto della Belimo Energy Valve™ e delle valvole a 6-vie indipendenti dalla pressione.
Tutte le portate di energia sono visualizzate in modo trasparente, in modo che Mourik possa eseguire facilmente e rapidamente le regolazioni necessarie tramite il sistema di gestione dell'edificio. Sulla base dei dati registrati, il sistema di gestione dell'edificio può anche ottimizzare le pompe di ricircolo.
L'implementazione di un progetto di tale portata spesso non va proprio secondo i piani e in genere richiede continue regolazioni. Belimo è stata in grado di aiutare Mourik in questo senso grazie alla consulenza tecnica e alle consegne rapide.
Questa ristrutturazione ha permesso all'edificio per uffici di Ethias di ottenere un punteggio BREEAM di "molto buono". In questo modo Ethias è sulla buona strada per diventare un'azienda a zero emissioni di carbonio entro il 2030. Insieme a Mourik, Belimo è onorata di aver contribuito a questo risultato.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Valvola di regolazione elettronica a 2-vie e a 6-vie indipendente dalla pressione (EPIV)
- Prodotti:
- Valvola di regolazione elettronica con misurazione dell'energia (Energy Valve)
- Messa in servizio:
- December, 2023
Empa NEST HiLo, Dübendorf (Svizzera)
L'architettura di domani: utilizzo efficiente dell'energia grazie alla tecnologia dell'edificio intelligente.
Per testare nuove tecnologie, materiali e sistemi nei settori dell'edilizia e dell'architettura, senza rischi e in condizioni reali, nel 2016 gli istituti di ricerca svizzeri Empa ed Eawag hanno fondato "NEST" (Next Evolution in Sustainable Building Technologies), l'edificio modulare di ricerca e innovazione. Al NEST, diversi partner in stretta collaborazione con i settori dell'economia, ricercano in un continuo sviluppo soluzioni edilizie ed energetiche rispettose delle risorse ed efficienti
dal punto di vista energetico.
- Località:
- Svizzera
- Tipologia di edificio:
- Fabbrica di ricerca, Edificio residenziale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Valvole di regolazione indipendenti dalla pressione, Attuatori, Attuatori per serrande (senza funz. sicurezza), Attuatori per serrande (con funz. sicurezza), Sensori
- Prodotti:
- Belimo Energy Valve™ con contatore di energia termica
- Prodotti:
- Vari attuatori
- Prodotti:
- Valvole di regolazione elettroniche indipendenti dalla pressione a 6 vie
- Prodotti:
- Vari sensori
- Messa in servizio:
- October, 2021
- Referenze – Empa NEST HiLo, Svizzera (pdf - 2 MB)
Emch+Berger ImmoConsult AG, Zurigo (Svizzera)
Buona aria interna e controllo del comfort ambiente senza problemi con supporto IoT.
Consumo energetico ottimizzato e monitoraggio permanente dell'energia grazie al Belimo Cloud.
Emch+Berger ImmoConsult AG è un'azienda del Gruppo Emch+Berger, fondato nel 1953. Le sue filiali in tutta la Svizzera offrono servizi di pianificazione, consulenza e gestione di beni immobili. Alla fine del 2020, l'azienda ha acquistato un nuovo spazio per uffici nella Seebahnstrasse a Zurigo. Grazie ai sistemi di ventilazione e raffreddamento completi e di nuova installazione, i dipendenti possono aspettarsi un elevato comfort ambiente. Il progetto è stato pianificato dalla Emch+Berger ImmoConsult AG, e la Hiltag AG di Bäretswil è stata l'integratore di sistemi.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di regolazione a sfera (CCV), Sensori, Sensori ambiente (aria), Sistemi, Integrazione bus
- Prodotti:
- Sensori ambiente
- Prodotti:
- Valvole di regolazione a sfera a 2 vie con attuatori IoT
- Prodotti:
- Sensori di condensa
- Prodotti:
- Valvola elettronica di pressione differenziale EDPV abilitata all'IOT
- Messa in servizio:
- December, 2020
- Referenze – Emch+Berger ImmoConsult AG, Svizzera (pdf - 2,12 MB)
Eglin Air Force Base
Pressure-Independent Valve Technology Earns Wings at Eglin AFB
Pressure-independent valve technology played a key role in a major Utility Energy Service Contract (UESC) Project at Eglin Air Force Base, Florida. The project, completed in late 2006, included the conversion of a chilled water plant, known as Building 42, to variable flow. The conversion helped the plant and the buildings that it serves meet the requirements outlined in the Energy Policy Act of 2005 and has also resulted in significant energy savings. The installation of 62 Belimo pressure-independent characterised control valves (PICCV) helped pave the way for a smooth transition to variable flow, ensuring that the base will continue to enjoy worry-free energy savings for years to come.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio governativo
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valves
- Reference - Eglin Air Force Base, USA (pdf - 212 KB)
Ospedale distrettuale Ludmillenstift, Meppen (Germania)
Distribuzione dell'energia ottimale con la Belimo Energy Valve™
L’ospedale Ludmillenstift è situato nella città di Meppen nella Sassonia meridionale (Germania) e ha una storia di oltre 160 anni come fornitore di assistenza sanitaria. Il grande ospedale interdisciplinare offre cure di alta qualità per i pazienti, supportato da un’infrastruttura moderna e da una tecnologia medica all’avanguardia, oltre a competenze diagnostiche e terapeutiche avanzate e servizi medici specializzati.
Dopo anni di crescita, il sistema HVAC dell'ospedale Ludmillenstift aveva raggiunto i suoi limiti. Tuttavia, con l'aiuto delle Belimo Energy Valve, l'energia richiesta dalla rete di riscaldamento ha potuto essere significativamente ridotta, permettendo così di utilizzare sistemi di riscaldamento e raffreddamento intelligenti, trasparenti, efficienti e dipendenti dal carico, aumentando allo stesso tempo il comfort e riducendo il consumo energetico.
- Località:
- Germania
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™
- Prodotti:
- Belimo Energy Valve™
Department of Transportation
Pressure-Independent Control Valves Meet Challenges of Variable Primary System
Variable primary chilled water systems can be a cost-effective alternative to standard primary/secondary systems and are becoming more commonplace for that reason. At the same time, these systems are often more challenging to control. In designing a variable primary system for the new Department of Transportation (DOT) headquarters in Washington D.C., the design firm of DMJM in Arlington, Virginia, met this challenge with pressure-independent control valves.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio governativo
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Pressure-Independent Characterised Control Valve
- Reference - Department of Transportation, USA (pdf - 114 KB)
CM, Hasselt (Belgio)
CM Hasselt concentra sei uffici in un'unica sede centrale ad alta efficienza energetica presso il Kanaalkom di Hasselt
I servizi locali del più grande fondo assicurativo sanitario del Belgio erano ripartiti in sei uffici obsoleti ad Hasselt. La nuova sede è un edificio molto accessibile, ampiamente illuminato e spazi vasti nei quali è piacevole lavorare. Con i suoi 16,500 m², l'edificio ospita uffici, un centro per l'infanzia, un ristorante e alcuni spazi commerciali. L'intero progetto è costato circa 35 milioni di euro.
La struttura modulare di quattro elementi interconnessi consente di eseguire facilmente regolazioni future. Questo permette a CM di affittare o vendere diverse parti dell'edificio.
Anche l'azienda HVAC Imtech ha tenuto conto di questa modularità. L'impianto senza combustibili fossili, con pompe di calore, fornisce sia il riscaldamento che il raffreddamento, mentre i pannelli solari forniscono l'energia elettrica necessaria. Gli oltre 250 soffitti climatizzati possono essere controllati individualmente con valvole a 6 vie EPIV pre-programmate e impostate da Belimo. In questo modo si risparmia un'enorme quantità di tempo durante l'installazione. Le Energy Valve Belimo regolano le corrette portate energetiche e allo stesso tempo monitorano in modo trasparente ogni consumo.
Imtech ha anche reso il sistema di ventilazione efficiente e sicuro con gli attuatori Belimo per serrande (tagliafuoco) .
I sensori Belimo presenti nell'unità di trattamento aria garantiscono una qualità perfetta del clima interno.
- Località:
- Belgio
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Valvole di regolazione a sfera (CCV), Belimo Energy Valve™, Sensori, Sensori da canale (aria), Sensori da tubazione (acqua)
- Prodotti:
- Valvola di regolazione indipendente dalla pressione (PIQCV)
- Prodotti:
- Valvola di regolazione a sfera (CCV)
- Prodotti:
- Valvola di regolazione elettronica a 6 vie indipendente dalla pressione (EPIV)
- Prodotti:
- Sensori di temperatura e di pressione
- Prodotti:
- Valvola di regolazione elettronica con misurazione dell'energia (Energy Valve)
- Messa in servizio:
- December, 2022
- Reference – CM Hasselt, Belgium (pdf - 1,47 MB)
Clinica Zan Mitrev, Skopje (Macedonia del Nord)
Anche la Belimo Energy Valve™ controlla il consumo energetico
Non sono solo i pazienti con problemi cardiaci a essere monitorati nella nuova clinica cardiologica Zan Mitrev di Skopje, in Macedonia. Dalla sua apertura il 1° marzo 2016, è anche possibile monitorare la portata di energia utilizzando la Belimo Energy Valve™. Come per la cardiochirurgia, l'intero sistema HVAC doveva soddisfare standard molto elevati in termini di precisione, affidabilità, trasparenza e sicurezza. La soluzione perfetta sta nelle precise e innovative Belimo Energy Valve™.
- Località:
- Macedonia del Nord
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Valvole di zona, Belimo Energy Valve™
- Prodotti:
- 36 Belimo Energy Valve™
- Prodotti:
- 112 valvole di regolazione 6-vie
- Referenze – Clinica Zan Mitrev, Macedonia del Nord (pdf - 1,61 MB)
Clarion Hotel Admiral, Bergen (Norway)
Maximum comfort in the rainiest city of Europe.
The Clarion Hotel Admiral is located in central Bergen (Norway) and enjoys picturesque views of the city’s infamous harbour, Bryggen. Originally used as a warehouse for boats coming and going to Bergen, the building was constructed in 1904 and has been operating as a hotel since 1987. The hotel offers 210 rooms and seven conference centres for up to 180 delegates.
Since Bergen is the rainiest city in Europe, it was particularly important to ensure excellent comfort and wellbeing for the hotel’s guests, including maintaining a high level of indoor air quality within the building. More than 30 years after the opening of the Clarion Hotel Admiral, it was time to renovate the building to increase energy efficiency and improve indoor air quality.
After hearing a podcast episode featuring the Belimo Energy Valve™, Geir Hovden of DNB Commercial Real Estate decided to implement the device despite being in the midst of the project. The Belimo Energy Valves now ensure an energy-efficient operation of the hotel and full data transparency. Moreover, the easy handling of the smart devices saved the company around 400,000 NOK of installation costs.
- Località:
- Norvegia
- Tipologia di edificio:
- Hotel
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™
- Prodotti:
- Belimo Energy Valves
- Messa in servizio:
- January, 2023
- Referenze – Clarion Hotel Admiral, Norvegia (pdf - 1,59 MB)
Cincinnati Metropolitan Sewer District
Belimo’s EF Spring Return Actuators Serve as Economical Alternative to MS41xx Series Actuators
During the replacement process, a number of different actuators were examined and after careful consideration the decision was made to replace the failing units with Belimo’s EFX120-S N4 spring return actuators. In addition to having a NEMA-4 rating, Belimo’s EF actuators offered higher torque (270 in-lbs) in a single direct-coupled unit, and because of this, only 150 actuators were required to do the work that the 250 MS41xx units originally did (one EF unit can effectively operate a 66 sq ft damper). The cost for the more robust EF actuators was almost equal to the cost of ordering 250 M-Series actuators.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Impianto di produzione
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Attuatori
- Prodotti:
- EF Spring Return Actuators
- Reference - Cincinnati Metropolitan Sewer District, USA (pdf - 2,23 MB)
CEG Schwarzwald 11
In a recent collaboration with Shanghai Bobo Architecture Technology Co. Ltd, our temperature, humidity and CO2 sensors – in combination with control valves and advanced automation systems – were installed in a new luxury apartment complex to provide perfect tenant comfort. The CEG Schwarzwald development is named after the mountainous Black Forest region of Germany, and the architects were keen for us to bring a taste of that fresh mountain air to 58 luxury apartments in the CEG Schwarzwald 11 building.
- Località:
- Cina
- Tipologia di edificio:
- Edificio residenziale
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Sensori ambiente (acqua), Sensori da canale (aria), Valvole a farfalla, Valvole di zona, Valvole di regolazione a sfera (CCV), Portata dell'aria variabile (VAV), Sensori da tubazione (acqua)
- CEG Schwarzwald 11 (pdf - 1,64 MB)
Canada Healthcare
Belimo sensors help streamline healthcare facility upgrades
Established in 2001, this publicly funded healthcare service provider is responsible for delivering health-related services to over 740,000 people across the southern interior region of British Columbia, Canada. The project involved switching from pneumatic to direct digital controls (DDC) to improve efficiency and modernise the building automation system (BAS). In total, Belimo supplied Houle with over 500 products for the building upgrades, including 339 sensors (temperature, pressure, humidity, CO2), 94 damper actuators, 77 universal global valve linkage retrofit kits, and 22 larger globe valves.The use of Belimo’s air differential pressure sensors helped save the owner $16,800 in upfront costs.
- Località:
- Canada
- Tipologia di edificio:
- Ospedale
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Sensori, Attuatori, Valvole a globo, Retrofit
- Prodotti:
- Sensors: 339 sets
- Prodotti:
- Damper actuators: 94 sets
- Prodotti:
- Globe valve linkage retofit: 77 sets
- Prodotti:
- Globe valve: 22 set
- Success Story - Canada Healthcare, CA (pdf - 2,86 MB)
- belimo_canada-healthcare_success-story_fr-ca.pdf (pdf - 2,39 MB)
- belimo_canada-healthcare_success-story_es-mx.pdf (pdf - 2,39 MB)
- belimo_canada-healthcare_success-story_pt-br.pdf (pdf - 2,38 MB)
Progettati per la forma e la funzione
I sensori ambiente Belimo hanno aiutato Smart Building Solutions (SBS) a soddisfare i requisiti più esigenti sia per quanto riguarda l'estetica che la funzionalità
Il 545wyn è un edificio per uffici di classe A a Wynwood. Gensler ha progettato l'edificio con tre obiettivi: 1) migliorare e valorizzare l'esperienza standard degli uffici di Miami, 2) riprodurre in modo autenticoe la vivacità di Wynwood e 3) impegnarsi con il quartiere di Wynwood. Smart Building Solutions (SBS), con sede a Miami, è stata incaricata di progettare l'intero sistema di controllo e automazione HVAC dell'edificio. L'estetica rappresentava un altro fattore critico. In linea con la visione del proprietario e dell'architetto, SBS voleva che ogni dispositivo di controllo visibile agli inquilini fosse semplice e si fondesse perfettamente con il design interno.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Sensori
- Prodotti:
- Sensors/Meters
- Messa in servizio:
- January, 2022
- Success Story - 545 Wyn (pdf - 1,22 MB)
Building improves energy efficiency with Belimo advanced butterfly valve
Advanced butterfly valve helps building complete retrofit on tight schedule
When it comes to HVAC system upgrades, the quality and reliability of the solutions often dictate the success of a project. This was clear in a recent undertaking by an Alabama-based financial services company that aimed to retrofit their HVAC system with the latest in energy efficient technology.
At the forefront of this endeavor was the integration of Belimo’s innovative new Advanced Butterfly Valve featuring the new JR actuator, a key element to significantly enhancing the system’s performance. This initiative was headed up by an experienced controls contractor, whose expertise and strategic selection of Belimo products played a pivotal role in steering the project towards success
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole a farfalla
- Prodotti:
- Advanced Butterfly Valve, Temperature Sensor
- Messa in servizio:
- March, 2024
- Success Story – Alabama Office Building, USA (pdf - 2,53 MB)
Sede centrale Bouygues Construction, Guyancourt (Francia)
La prima ristrutturazione di edifici al mondo a ricevere la tripla certificazione
Il sito Challenger nel sobborgo parigino di Guyancourt è ad oggi unico al mondo per quanto riguarda la ristrutturazione di edifici sostenibili. Nel 2014 il gruppo edile francese Bouygues ha ristrutturato tutti gli edifici della sua sede centrale, costruiti nel 1988 e con una superficie totale di 67,000 m², secondo le più severe specifiche ambientali e di efficienza energetica. Il consumo di energia primaria e di acqua è stato così ridotto rispettivamente al 10% e al 40% dei valori originari.
- Località:
- Francia
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Valvole di regolazione indipendenti dalla pressione, Belimo Energy Valve™
- Prodotti:
- 50 Belimo Energy Valve™
- Report – Headquarters of Bouygues Construction, France (pdf - 2,8 MB)
Boston Marriot Cambridge
The Belimo two-way electronic zone valves selected for the Marriott project
As Director of Engineering for the Boston Marriott Cambridge, Robert Vass knows that each mechanical decision he makes for the hotel has 431 opportunities to fail. That’s the number of guestrooms at the hotel, located in the historic Kendall Square district of Boston. So when it came to replacing the zone valves in the fan coil units in all the guestrooms during a major renovation, reliability was his fi rst priority.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Hotel
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole di zona
- Prodotti:
- Zone Valves
- Reference - Boston Marriott Cambridge, USA (pdf - 112 KB)
Belimo Energy Valve™ Reduces Carbon Emissions by 40%
NYC Building Owner Achieves Compliance with Belimo RetroFIT+
In response to a regulatory mandate in New York City focused on improving energy efficiency and reducing carbon emissions for large buildings starting in 2024, a major property management company upgraded key buildings with the Belimo Energy Valve™, a pioneering, IoT-enabled device designed to optimize energy use and maintain Delta T in HVAC systems.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- August, 2024
- Reference – Paramount Group, New York, USA (pdf - 3,95 MB)
Belimo Energy Valve™ Helps Providence College Save Millions
Belimo RetroFIT+ uncovers energy savings in existing buildings.
Founded in 1917, Providence College sits on an illustrious 105-acre campus in the heart of Providence, Rhode Island.
The retrofit project was completed in Spring 2023, and now Arden and Providence College plan to begin collecting data to quantify the actual fl ow reductions. The reduction in pumping will lead to decreased electricity usage, which is in line with the college’s commitment to increase energy effi ciency and improve environmental, social, and governance (ESG) performance. Allowing their cooling needs to be met with the existing chiller plant confi guration, the school saved the cost of buying and installing a new chiller, amounting to an estimated $500,000 - $1,000,000 in savings. This fi gure excludes the millions of additional funds and months of work that would have been needed to resize and replace the existing main chilled water line.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Belimo Energy Valve™
- Messa in servizio:
- October, 2023
- Success Story - Providence College EV, USA (pdf - 4,89 MB)
Belimo Energy Valve™ at Land O'Lakes, Inc., Minnesota
Belimo Energy Valve Plays Integral Role in Land O’ Lakes, Inc.’s Corporate Facility Upgrade
Land O’ Lakes, Inc.’s Corporate Sustainability Group began making plans to upgrade the facilities in order to increase efficiency and reduce energy consumption. HVAC systems were a particular area of focus due to the fact that as the buildings aged, they became more difficult to cool and meet the desired discharge air temperature set points (especially in the summer months). Improving occupant comfort was also a priority.
After conducting a thorough review of piping, valves, and instrumentation, officials concluded that in order to solve the problem, various infrastructure improvements would have to be made. They then began the process of searching for a solution, which eventually led them to the Belimo Energy Valve™.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Energy Valves
- Reference - Land O'Lakes, USA (pdf - 379 KB)
- Infographic - Land O'Lakes, USA (pdf - 579 KB)
Belimo Energy Valve™ at a Global Technology Company
Belimo and Optimum Energy Test Energy Valve’s Ability to Sustain HVAC Performance
Since its establishment in 1975, Belimo has innovated a number of major developments in HVAC actuator technology and became a worldwide leader in the HVAC industry. With its partner, Optimum Energy, a member of the U.S. Green Building Council and specialists in data-driven HVAC energy optimisation for campuses and large facilities, a pilot project was undertaken at the headquarters of one of Optimum Energy’s Fortune 100 clients. The purpose was to test the impact of the award-winning Belimo Energy Valve on long-term sustainability by combating HVAC system problems associated with low Delta-T.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole
- Prodotti:
- Belimo Energy Valve
- Success Story - Global Technology Company, USA (pdf - 244 KB)
Belimo Energy Valve Helps Berkeley County, West Virginia Cut HVAC Energy Usage in Half
Since taking sole ownership of the Dunn Building in West Virginia, Berkeley County officials have initiated multiple capital improvement projects to lower costs and increase energy efficiency. The most recent upgrade with Maryland-based Boland Trane was to perform a complete overhaul of the building's heating and cooling systems. For the project, Boland replaced several outdated system components with state-of-the-art energy-conserving technologies – one of which was the Belimo Energy Valve™.
The upgrade project's primary motivation was to decrease HVAC energy consumption and cost and improve occupant comfort. Boland Trane's solution for achieving these goals was two-fold. The first objective was to improve the efficiency of the production of hot and chilled water. The second was to optimize the utilization to meet the building's heating and cooling load.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole di regolazione indipendenti dalla pressione
- Prodotti:
- Pressure Independent
- Success Story - Dunn Buildings, USA (pdf - 1,24 MB)
Belimo Atrium, Hinwil (Svizzera)
Spazi di lavoro moderni con un comfort ambiente ottimale.
Dal 1987, la sede centrale di Belimo si trova a Hinwil, nel cantone di Zurigo (Svizzera). L'edificio originale, in cui Belimo si è trasferita dodici anni dopo la sua fondazione, è stato ampliato nel corso del tempo, di pari passo con la crescita dell'azienda ed è stato ristrutturato poco dopo la fine del millennio. Ospita uffici, officine, magazzini e laboratori, oltre a un Experience Center. All'ultimo piano dell'edificio, nel "Belimo Atrium", si trovano gli uffici della divisione Servizi finanziari e aziendali su una superficie di 1.000 m². Il numero crescente di dipendenti ha richiesto un aumento del numero di postazioni di lavoro. Allo stesso tempo, la tecnologia dell'edificio generale doveva essere rinnovata. Di conseguenza, è stato avviato un progetto di ristrutturazione globale. Uno degli obiettivi della ristrutturazione totale del piano era quello di fornire ai dipendenti un ufficio all'avanguardia che offrisse sempre un eccellente comfort ambiente grazie a un design e a riscaldamento, ventilazione e condizionamento dell'aria intelligenti, come richiesto. La tecnologia dell'edificio è stata progettata da Jobst Willers AG, mentre l'integrazione dei sistemi è stata eseguita da Demont Engineering GmbH.
- Località:
- Svizzera
- Tipologia di edificio:
- Edificio uffici, Impianto di produzione
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Attuatori, Portata dell'aria variabile (VAV), Sensori
- Prodotti:
- Energy Valve Belimo
- Prodotti:
- Valvole di regolazione
- Prodotti:
- Attuatori VAV
- Prodotti:
- Vari sensori
- Messa in servizio:
- April, 2022
- Referenze – Belimo Atrium, Svizzera (pdf - 2,22 MB)
Stabilimento automobilistico (Türkiye)
Risparmia 1.080 tonnellate metriche di CO2 in tre mesi.
Nell'ambito di un progetto Belimo RetroFIT+ lo stabilimento di un produttore automobilistico internazionale è stato dotato di Belimo Energy Valve per ottimizzare il comfort interno e ridurre le emissioni di CO2 dello stabilimento. I primi successi sono stati raggiunti solo tre mesi dopo il commissioning: rispetto ai primi tre mesi dell'anno precedente, sono stati risparmiati 934.000 Sm3 di gas naturale e sono state evitate 1.080 tonnellate metriche di emissioni di CO2.
- Località:
- Turchia
- Tipologia di edificio:
- Impianto di produzione, Edificio uffici
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Sensori, Thermal Energy Meters
- Prodotti:
- Belimo Energy Valve con contatore di energia termica
- Messa in servizio:
- January, 2021
- Referenze – Automotive Plant, Turchia (pdf - 1,51 MB)
Attleboro High School Sets New Standards in Efficiency with Belimo EPIV
Belimo EPIV, PIQCV Helps School Achieve Efficiency Goals
Attleboro High School recently underwent a significant transformation with the construction of an all-new $260 million campus, representing the largest municipal undertaking in the history of Attleboro, Massachusetts. Breaking ground in October 2019, and opening its doors for the first time in September 2022, the new AHS is a four-story edifice encompassing 475,000 square feet with the capacity to accommodate 1,725 students.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Scuole / università
- Tipo di progetto:
- Nuovo edificio
- Gamma prodotti:
- Valvole di regolazione indipendenti dalla pressione
- Messa in servizio:
- July, 2024
- Success Story – Attleboro High School (pdf - 2,04 MB)
Assisi Heights
Belimo Puts the FIT in RetroFIT with Space saving Solutions for Assisi Heights Renovation
Those seeking comfort will find it at Assisi Heights in Rochester, Minnesota. Indoor air comfort that is, now that a comprehensive renovation of the facilities HVAC mechanical system is complete. For many years, that was not the case.
Until recently, the Sisters of St. Francis of Rochester, along with others who lived, worked, and taught at the historical convent, did so without air conditioning and a very outdated steam heating system.
- Località:
- Stati Uniti
- Tipologia di edificio:
- Struttura per il tempo libero
- Tipo di progetto:
- Ristrutturazione
- Gamma prodotti:
- Retrofit
- Prodotti:
- Globe Valves
- Reference - Assisi Heights Renovation, USA (pdf - 1,56 MB)
AR Bygg, Umeå (Svezia)
Massimizzare l'efficienza degli edifici con la Belimo Energy Valve™.
Il nome Belimo è noto per la fornitura di soluzioni HVAC di alta qualità, che hanno portato i nostri dispositivi in alcuni degli edifici commerciali più complessi del mondo. Tuttavia, il nostro programma prevede anche progetti più piccoli. Quando si tratta di comfort ed efficienza energetica, siamo in grado di affrontare tutte le sfide, grandi o piccole che siano.
Per questo, quando AR Bygg, un'azienda con sede nel nord della Svezia (Umeå), ci ha chiesto di contribuire con la nostra esperienza a un progetto residenziale di piccole dimensioni, siamo stati molto entusiasti di questo progetto unico.
- Località:
- Svezia
- Tipologia di edificio:
- Edificio residenziale
- Tipo di progetto:
- Nuovo edificio, Ristrutturazione
- Gamma prodotti:
- Valvole, Belimo Energy Valve™, Sensori, Sensori da canale (aria)
- Prodotti:
- Belimo Energy Valve™
- Prodotti:
- Vari sensori
- Messa in servizio:
- January, 2020
- Referenze – AR Bygg, Svezia (pdf - 1,75 MB)